TEXAS · WELLS · KENEDY COUNTY · API 42-261-30825 · DISTRICT 04

Kenedy John G. Jr. E #44

Plugged

Kenedy County · Sarita (3-C S) field  · Vertical

Kenedy John G. JR. E #44 (API 42-261-30825) is a plugged well in Kenedy County, plugged October 27, 2005, last operated by Exxon Mobil Corporation.

The RRC has issued 5 drilling permits (amended twice) between 1983 and 1996, permitted to 5,750 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including 2-K, 4-A, 5-C, Sw.

Its 7 leases have reported 142K barrels of oil and 451K mcf of gas since January 1993, last reporting in October 2010. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Mobil Corporationthrough Jul 2008
Latest permitExxon Corp.Oct 29, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,750
total depth, ft
7
permits on file
Oct 29, 1996
last permit issued
Jan 3, 1997
completed
142K
cumulative oil, bbl
451K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 3, 1997
Shut in
—
Plugged
Oct 27, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 7 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kenedy, John G., Jr. "E" O-4-10363Sarita (5-L&m,sw)Exxon Mobil Corporation2142K104KJan 1993 – Oct 2010
Kenedy, John G. Jr. "E" G-4-157072Sarita (3-C, S)Exxon Mobil Corporation10119KJan 1996 – Oct 2005
Kenedy, John G. Jr. "E" G-4-162036Sarita (1-G,c)Exxon Mobil Corporation1094KDec 1996 – Oct 2005
Kenedy, John G. Jr. "E" O-4-12582WildcatExxon Corp.100Apr 1996 – Mar 1997
Kenedy, John G. Jr. "E" O-4-12521Sarita (5-E SW)Exxon Corp.100Nov 1995 – Jul 1996
Kenedy, John G. Jr. "E" G-4-146841Sarita (4-A)Exxon Corp.10134KSep 1993 – Jan 1996
Kenedy, John G. Jr. "E" O-4-10362Sarita (5-C, SW)Exxon Corp.100Jan 1993 – Oct 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Dec 1999
  2. 2Exxon Mobil CorporationApr 2000 → Jul 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
454475-98RecompletionExxon Corp.Mar 5, 1997Oct 29, 1996Oct 21, 19963,293
454475-99RecompletionExxon Corp.Oct 29, 1996Oct 29, 1996—3,293
449891-99DrillExxon Corp.Jul 1, 1996Jul 1, 1996Jan 29, 19963,293
439676-98RecompletionExxon Corp.Dec 20, 1995Sep 7, 1995Aug 15, 19954,790
439676-99RecompletionExxon Corp.Sep 7, 1995Sep 7, 1995—4,790
415111-99RecompletionExxon Corp.Aug 19, 1993Aug 19, 1993Aug 30, 19934,042
195198-99DrillExxon Corp.May 16, 1983May 16, 1983Jul 14, 19835,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 3, 1997Kenedy John G. Jr. E G-4-157072Sarita (3-C S)Exxon Mobil CorporationPlugged—
Dec 31, 1996Kenedy John G. Jr. E G-4-162036Sarita (1-G C)Exxon Mobil CorporationPlugged—
Apr 2, 1996Kenedy John G. Jr. E O-4-12582WildcatExxon Corp.Plugged—
Nov 10, 1995Kenedy John G. Jr. E O-4-12521Sarita (5-E SW)Exxon Corp.Plugged—
Sep 1, 1993Kenedy John G. Jr. E G-4-146841Sarita (4-A)Exxon Corp.Plugged—
Oct 7, 1983Kenedy John G. Jr. E O-4-10362Sarita (5-C SW)Exxon Corp.Plugged—
Aug 7, 1983Kenedy John G. Jr. E O-4-10363Sarita (5-L&M SW)Exxon Mobil CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 43 ft elevation.Download CSV →

FormationMD ftSubsea
2-K3,263-3,220
4-A3,970-3,927
5-C, SW4,436-4,393

Perforations

Perforated and open-hole intervals.

FromToType
2,2402,245Perforated
3,2363,243Perforated
3,6643,676Perforated
3,9793,984Perforated
3,9883,992Perforated
4,4444,462Perforated
4,7324,740Perforated
4,8454,857Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37532117.5355 S
8.6252,53512.25908 S
8.6252,53612.25908 S
1.254,360——
2.8755,3397.875945 S
2.8755,350——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 17, 1997Feb 28, 1997Yes
00Apr 10, 1997Feb 27, 1997—
00Mar 18, 1997——
00Oct 18, 1996Jul 5, 1996Yes
00Jul 19, 1996Jan 29, 1996Yes
00May 22, 1996Jan 29, 1996Yes
00Mar 26, 1996Jan 29, 1996Yes
00Mar 8, 1996——
00Feb 12, 1996Nov 7, 1983Yes
00Jan 7, 1994Oct 18, 1993Yes
00Oct 26, 1993——
00Jan 12, 1984Nov 7, 1983—
00Jan 12, 1984Oct 17, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130825, documented in the API reference.