TEXAS · WELLS · KENEDY COUNTY · API 42-261-30890 · DISTRICT 04
East Mrs. S. K. #169
Kenedy County · Wildcat field · Vertical
East Mrs. S. K. #169 (API 42-261-30890) is a plugged well in Kenedy County, plugged August 20, 2013, last operated by Headington Oil Company LLC.
The RRC has issued 4 drilling permits between 1983 and 2001, permitted to 10,200 ft.
It was permitted by Exxon Mobil Corporation and has since transferred to Headington Oil Company LLC on the wellbore schedule.
Operator of record
Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 29, 2015
- Permits on file
- 45
- Phone
- (214) 696-0606
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Exxon Mobil CorporationJul 12, 2001 |
- 10,200
- total depth, ft
- 4
- permits on file
- Jul 12, 2001
- last permit issued
- Sep 7, 2001
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 7, 2001
- Shut in
- —
- Plugged
- Aug 20, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| East, Mrs. S. K. G-4-186043 | Wildcat | Headington Oil Company LLC | 1 | 0 | 0 | Sep 2001 – Aug 2013 |
| East, S.K. Mrs. G-4-143914 | Rita, N.E. (I-70) | Exxon Mobil Corporation | 1 | 0 | 0 | Jan 1993 – Sep 2001 |
| — G-4-109243 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 511401-99 | Recompletion | Exxon Mobil Corporation | Jul 12, 2001 | Jul 12, 2001 | Aug 2, 2001 | 9,740 |
| 406812-99 | Recompletion | Exxon Corp. | Dec 3, 1992 | Dec 3, 1992 | Dec 9, 1992 | 8,730 |
| 278762-99 | Recompletion | Exxon Corp. | Jun 24, 1985 | Jun 25, 1985 | — | 9,800 |
| 223395-99 | Drill | Exxon Corp. | Dec 8, 1983 | Dec 13, 1983 | Dec 19, 1983 | 10,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 7, 2001 | East Mrs. S. K. G-4-186043 | Wildcat | Headington Oil Company LLC | Plugged | — |
| Dec 10, 1992 | East S.K. Mrs. G-4-143914 | Rita N.E. (I-70) | Exxon Mobil Corporation | Plugged | — |
| Jan 13, 1984 | East S.K. Mrs. G-4-109243 | Rita NE. (I-95) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,886 | 6,896 | Perforated |
| 8,664 | 8,680 | Perforated |
| 8,907 | 8,911 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,542 | 12.25 | 650 S |
| 2.875 | 9,785 | 7.875 | 1,080 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 17, 2002 | Dec 14, 2001 | Yes |
| 00 | Dec 27, 2001 | — | — |
| 00 | Mar 25, 1993 | Feb 10, 1993 | Yes |
| 00 | Feb 16, 1993 | — | — |
| 00 | Apr 25, 1984 | Feb 23, 1984 | — |
| 00 | Mar 27, 1984 | Feb 23, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30890 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30890 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130890, documented in the API reference.