WELL · 42-261-30926 · DISTRICT 4

Sarita Field Oil & Gas Unit #187D

Plugged

Kenedy County · Sarita (18-A) field  · Vertical

Sarita Field Oil & Gas Unit #187D (API 42-261-30926) is a plugged well in Kenedy County, plugged December 16, 2009, last operated by Exxon Corp..

The RRC has issued 10 drilling permits between 1984 and 2000, permitted to 8,600 ft.

It was permitted by Exxon Mobil Corporation and has since transferred to Exxon Corp. on the wellbore schedule.

Its 5 leases have reported 19.5K barrels of oil and 74.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 24 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Corp.

Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsExxon Mobil Corporationthrough Mar 2001
Latest permitExxon Mobil CorporationOct 6, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,600
total depth, ft
10
permits on file
Oct 6, 2000
last permit issued
Jan 2, 1989
completed
19.5K
cumulative oil, bbl
74.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 2, 1989
Shut in
—
Plugged
Dec 16, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sarita Field Oil & Gas Unit O-4-10608WildcatHeadington Energy Partners, LLC10107.51KJan 1993 – Jul 2026
Sarita Field Oil & Gas Unit O-4-6963Sarita ( 3-E)Exxon Mobil Corporation1119.5K33KJan 1993 – Oct 2010
Sarita Field Oil & Gas Unit G-4-179576Sarita ( 5-G)Exxon Mobil Corporation1033.6KAug 2000 – Dec 2009
Sarita Field Oil & Gas Unit G-4-169566Sarita (10-A)Exxon Mobil Corporation100Jul 1998 – Aug 2000
Sarita Field Oil & Gas Unit G-4-112589Sarita (18-A)Exxon Corp.100Jan 1993 – Jul 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Apr 1998
  2. 2Exxon Mobil CorporationJun 2000 → Mar 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
500519-99RecompletionExxon Mobil CorporationOct 6, 2000Oct 6, 2000Aug 21, 20006,120
471854-99RecompletionExxon Corp.Jan 5, 1998Jan 7, 1998Jul 15, 19987,400
420744-99RecompletionExxon Corp.Feb 2, 1994Feb 2, 1994Mar 17, 19947,400
353687-99OtherExxon Corp.Nov 28, 1988Nov 29, 1988—8,600
350702-99RecompletionExxon Corp.Aug 29, 1988Aug 30, 1988—8,600
347497-99RecompletionExxon Corp.Jun 8, 1988Jun 9, 1988—8,600
294583-99RecompletionExxon Corp.Mar 7, 1986Jan 3, 1986—8,600
283419-99RecompletionExxon Corp.Aug 23, 1985Aug 26, 1985—8,600
268528-99RecompletionExxon Corp.Mar 4, 1985Mar 5, 1985—8,600
232884-99DrillExxon Corp.Mar 19, 1984Mar 20, 1984May 8, 19848,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-112589————
—— G-4-169566————
—— G-4-179576————
—— O-4-6963————
—— O-4-10608————

Perforations

Perforated and open-hole intervals.

FromToType
3,6563,676Perforated
4,5644,574Perforated
5,6885,694Perforated
6,0786,084Perforated
6,2896,294Perforated
6,6706,684Perforated
7,0007,010Perforated
7,1297,139Perforated
7,1667,179Perforated
7,4357,458Perforated
7,9597,965Perforated
8,1088,116Perforated
8,1318,134Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37529117.5350 S
13.37529317.5350 S
8.6252,64412.251,335 S
8.6252,64512.251,335 sx
8.6252,64912.251,335 S
8.6252,66312.251,335 S
2.8758,1857.875576 S
2.8758,185—576 S
2.8758,1967.875878 S
2.87516,3817.8751,454 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 2001Oct 20, 2000Yes
00Nov 22, 2000——
00Sep 11, 1998Aug 12, 1998Yes
00Sep 3, 1998——
00Oct 10, 1994Apr 15, 1994Yes
00Apr 28, 1994——
00Apr 6, 1989Feb 15, 1989Yes
00Mar 27, 1989Jan 24, 1989Yes
00Feb 17, 1989——
00Sep 30, 1988Sep 1, 1988—
00Mar 25, 1986Feb 20, 1986Yes
00Mar 15, 1986——
00Dec 11, 1985Nov 1, 1985Yes
00Nov 27, 1985Nov 1, 1985Yes
00Jul 25, 1985Jun 28, 1985—
00Jul 15, 1985Jun 28, 1985—
00Feb 14, 1985Jan 22, 1985—
00Feb 12, 1985——
00Oct 3, 1984Sep 10, 1984—
00Oct 2, 1984Sep 10, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130926, documented in the API reference.