TEXAS · WELLS · KENEDY COUNTY · API 42-261-30954 · DISTRICT 04
Sarita Field Oil & Gas Unit #193
Kenedy County · Wildcat field · Shut In · Vertical
Sarita Field Oil & Gas Unit #193 (API 42-261-30954) is a well in Kenedy County operated by Headington Energy Partners LLC, completed February 8, 1999 and listed as shut in on the RRC schedule, shut in April 1, 2004.
The RRC has issued 3 drilling permits (amended once) between 1984 and 1997, permitted to 8,500 ft.
It was permitted by Exxon Corp. and has since transferred to Headington Energy Partners LLC on the wellbore schedule.
Its 5 leases have reported 10 barrels of oil and 36.5K mcf of gas since January 1993, last reporting in July 2026. The leases carry 15 wells, so these are lease totals, not this well alone.
Operator of record
Headington Energy Partners LLC
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Corpus Christ, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 26, 2025
- Permits on file
- 175
- Phone
- (361) 885-0110
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | Exxon Mobil Corporationthrough Mar 2004 |
| Latest permit | Exxon Corp.Nov 3, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,500
- total depth, ft
- 4
- permits on file
- Nov 3, 1997
- last permit issued
- Feb 8, 1999
- completed
- 10
- cumulative oil, bbl
- 36.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 8, 1999
- Shut in
- Apr 1, 2004
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 15 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sarita Field Oil & Gas Unit G-4-194236 | Sarita Shallow (Mio-Frio Cons.) | Headington Energy Partners, LLC | 1 | 0 | 29K | Feb 2003 – Jul 2026 |
| Sarita Field Oil & Gas Unit O-4-10608 | Wildcat | Headington Energy Partners, LLC | 10 | 10 | 7.51K | Jan 1993 – Jul 2026 |
| Sarita Field Oil and Gas Unit O-4-12852 | Sarita (10-A) | Exxon Mobil Corporation | 1 | 0 | 0 | Jan 1999 – May 2003 |
| Sarita FLD O & G Unit O-4-10876 | Sarita (14-F, E) | Exxon Corp. | 2 | 0 | 0 | Jan 1993 – Aug 1999 |
| Sarita Field Oil & Gas Unit O-4-5994 | Sarita (17-I) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – May 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Mobil CorporationJun 2000 → Mar 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 469574-98 | Recompletion | Exxon Corp. | Feb 23, 1998 | Nov 3, 1997 | Dec 30, 1997 | 8,230 |
| 469574-99 | Recompletion | Exxon Corp. | Nov 3, 1997 | Nov 3, 1997 | — | 8,230 |
| 275939-99 | Recompletion | Exxon Corp. | Sep 4, 1985 | May 22, 1985 | — | 8,500 |
| 246174-99 | Drill | Exxon Corp. | Jul 23, 1984 | Jul 24, 1984 | Aug 1, 1984 | 8,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 8, 1999 | Sarita Field Oil & Gas Unit O-4-10608 | Wildcat | Headington Energy Partners LLC | Shut In · shut in Jan 1, 1999 | 8,500 |
| — | Sarita Field Oil & Gas Unit G-4-194236 | Sarita Shallow (Mio-Frio Cons.) | Headington Energy Partners LLC | Temp Abandoned · shut in Apr 1, 2004 | 8,500 |
| Jan 15, 1999 | Sarita Field Oil and Gas Unit O-4-12852 | Sarita (10-A) | Exxon Mobil Corporation | Not on Schedule | — |
| Sep 25, 1985 | Sarita FLD O & G Unit O-4-10876 | Sarita (14-F E) | Exxon Corp. | Not on Schedule | — |
| Dec 4, 1984 | Sarita Field Oil & Gas Unit O-4-5994 | Sarita (17-I) | Exxon Corp. | Not on Schedule | — |
| Nov 26, 1984 | Sarita Field Oil & Gas Unit O-4-10659 | Sarita (15-J) | Exxon Corp. | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,130 | 6,140 | Perforated |
| 6,894 | 6,902 | Perforated |
| 7,200 | 7,206 | Perforated |
| 8,044 | 8,050 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 311 | 17.5 | 310 S |
| 8.625 | 2,510 | 12.25 | 1,050 S |
| 8.625 | 2,510 | 12.5 | 1,050 S |
| 2.875 | 8,486 | 7.875 | 1,250 S |
| 2.875 | 8,487 | 7.875 | 1,250 S |
| 2.875 | 8,487 | — | — |
| — | 8,487 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 7, 2010 | Sep 16, 2010 | — |
| 00 | May 21, 2003 | Mar 27, 2003 | — |
| 00 | May 9, 2003 | — | — |
| 00 | Sep 14, 1999 | Jul 16, 1999 | Yes |
| 00 | Aug 31, 1999 | Oct 10, 1985 | Yes |
| 00 | Jul 2, 1999 | Mar 8, 1999 | Yes |
| 00 | May 14, 1999 | Jan 3, 1985 | — |
| 00 | Feb 4, 1986 | Oct 10, 1985 | Yes |
| 00 | Nov 6, 1985 | — | — |
| 00 | Jan 29, 1985 | Jan 3, 1985 | — |
| 00 | Jan 23, 1985 | — | — |
| 00 | Jan 7, 1985 | Dec 3, 1984 | — |
| 00 | Dec 22, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30954 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30954 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130954, documented in the API reference.