TEXAS · WELLS · KENEDY COUNTY · API 42-261-31131 · DISTRICT 04
Stewart #A 3
Kenedy County · Santa Rosa (J-99) field · Vertical
Stewart #A 3 (API 42-261-31131) is a plugged well in Kenedy County, plugged August 13, 2010, last operated by Apache Corporation.
The RRC has issued 2 drilling permits between 1992 and 2006, permitted to 11,500 ft.
Completion filings report 2 formation tops, including Sand, Clay, Sand, Shale.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 3, 2025
- Permits on file
- 9,757
- Phone
- (713) 954-5500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Apache Corporation |
| Production reports | Apache Corporationthrough Aug 2006 |
| Latest permit | Apache CorporationJun 13, 2006 |
- 11,500
- total depth, ft
- 2
- permits on file
- Jun 13, 2006
- last permit issued
- Jul 27, 2006
- completed
- 0
- cumulative oil, bbl
- 1.95M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 27, 2006
- Shut in
- —
- Plugged
- Aug 13, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stewart G-4-224189 | Santa Rosa (J-99) | Apache Corporation | 1 | 0 | 6.38K | Jul 2006 – Aug 2010 |
| Stewart G-4-143639 | Santa Rosa (10,700) | Apache Corporation | 1 | 0 | 1.95M | Jan 1993 – Jul 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Headington Oil CompanyJan 1993 → Sep 1996
- 2Apache CorporationJul 2006 → Aug 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 620889-99 | Recompletion | Apache Corporation | Jun 13, 2006 | Jun 13, 2006 | Mar 28, 2006 | 10,977 |
| 403995-99 | Drill | Headington Oil Company | Sep 28, 1992 | Sep 30, 1992 | Nov 17, 1992 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 27, 2006 | Stewart G-4-224189 | Santa Rosa (J-99) | Apache Corporation | Plugged | — |
| Dec 21, 1992 | Stewart G-4-143639 | Santa Rosa (10 700) | Apache Corporation | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,290 | 10,578 | Perforated |
| 10,656 | 10,930 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 80 | — | — |
| 9.625 | 1,840 | 12.25 | 595 S |
| 5.5 | 10,977 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 30, 2007 | Jan 26, 2007 | — |
| 00 | Feb 1, 2007 | — | — |
| 00 | Jul 27, 1993 | May 6, 1993 | — |
| 00 | Feb 22, 1993 | Jan 12, 1993 | Yes |
| 00 | Jan 28, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-31131 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-31131 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26131131, documented in the API reference.