WELL · 42-261-31155 · DISTRICT 4
Sarita Field Oil & Gas Unit #219
Kenedy County · Sarita Shallow (Mio-Frio Cons.) field · Vertical
Sarita Field Oil & Gas Unit #219 (API 42-261-31155) is a plugged well in Kenedy County, plugged August 1, 2024, last operated by Headington Energy Partners LLC.
The RRC has issued 3 drilling permits between 1994 and 1997, permitted to 6,550 ft.
It was permitted by Exxon Corp. and has since transferred to Headington Energy Partners LLC on the wellbore schedule.
Completion filings report 3 formation tops, including 2-G, 7-B, 11-Ab.
Its 4 leases have reported 296K barrels of oil and 469K mcf of gas since January 1993, last reporting in July 2026. The leases carry 57 wells, so these are lease totals, not this well alone.
Operator of record
Headington Energy Partners LLC
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Corpus Christ, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 26, 2025
- Permits on file
- 175
- Phone
- (361) 885-0110
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Headington Energy Partners LLC |
| Production reports | Headington Energy Partners, LLCthrough Apr 2026 |
| Latest permit | Exxon Corp.Dec 10, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,550
- total depth, ft
- 3
- permits on file
- Dec 10, 1997
- last permit issued
- Feb 10, 1998
- completed
- 296K
- cumulative oil, bbl
- 469K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 10, 1998
- Shut in
- —
- Plugged
- Aug 1, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 57 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sarita Field Oil & Gas Unit O-4-13623 | Sarita Shallow (Mio-Frio Cons.) | Headington Energy Partners, LLC | 43 | 158K | 262K | Sep 2010 – Jul 2026 |
| Sarita Field Oil & Gas Unit O-4-6965 | Sarita ( 5-KLM, C) | Exxon Mobil Corporation | 12 | 138K | 144K | Jan 1993 – Oct 2010 |
| Sarita Field Oil & Gas Unit G-4-156226 | Sarita (11-a & B, E) | Exxon Corp. | 1 | 0 | 15.7K | Nov 1995 – Feb 1998 |
| Sarita Field Oil & Gas Unit G-4-151581 | Sarita (12-a, C) | Exxon Corp. | 1 | 0 | 48.2K | Oct 1994 – Nov 1995 |
Oil, barrels lease total
Last 12 months 20,560 · prior 12 4,944(+316%)
Gas, mcf lease total
Last 12 months 47,907 · prior 12 6,927(+592%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Oct 2003
- 3Headington Oil Company LLCSep 2014 → Nov 2014
- 4Headington Energy Partners, LLCMar 2015 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 470924-99 | Recompletion | Exxon Corp. | Dec 5, 1997 | Dec 10, 1997 | Feb 5, 1998 | 5,509 |
| 438950-99 | Recompletion | Exxon Corp. | Aug 15, 1995 | Sep 8, 1995 | Nov 15, 1995 | 6,260 |
| 427463-99 | Drill | Exxon Corp. | Aug 29, 1994 | Aug 29, 1994 | Sep 6, 1994 | 6,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-151581 | — | — | — | — |
| — | — G-4-156226 | — | — | — | — |
| — | — O-4-6965 | — | — | — | — |
| — | — O-4-13623 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 35 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 2-G | 2,651 | -2,616 |
| 7-B | 5,424 | -5,389 |
| 11-AB | 6,220 | -6,185 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,694 | 4,708 | Perforated |
| 6,202 | 6,210 | Perforated |
| 6,352 | 6,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 283 | 17.5 | 450 S |
| 8.625 | 1,461 | 12.25 | 1,020 S |
| 2.875 | 6,546 | 7.875 | 1,870 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 5, 2010 | Mar 11, 1998 | Yes |
| 00 | Apr 28, 1998 | Mar 11, 1998 | Yes |
| 00 | Apr 8, 1998 | — | — |
| 00 | Feb 5, 1996 | Dec 7, 1995 | Yes |
| 00 | Dec 12, 1995 | — | — |
| 00 | Dec 12, 1994 | Nov 2, 1994 | Yes |
| 00 | Nov 7, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-31155 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-31155 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26131155, documented in the API reference.