TEXAS · WELLS · KENEDY COUNTY · SARITA FIELD OIL & GAS UNIT LEASE · API 42-261-31174 · DISTRICT 04

Sarita Field Oil & Gas Unit #220

Plugged

Kenedy County · Wildcat field  · Vertical

Sarita Field Oil & Gas Unit #220 (API 42-261-31174) is a plugged well in Kenedy County, plugged December 29, 1997, last operated by Headington Energy Partners LLC.

The RRC has issued one drilling permit, issued November 18, 1996, permitted to 10,700 ft.

It was permitted by Exxon Corp. and has since transferred to Headington Energy Partners LLC on the wellbore schedule.

Completion filings report 3 formation tops, including 2-A, 2-F, 2-M.

Its lease has reported 10 barrels of oil and 7.51K mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Headington Energy Partners LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Corpus Christ, TX
P-5 status
Active (A)
P-5 last filed
Aug 26, 2025
Permits on file
175
Phone
(361) 885-0110

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHeadington Energy Partners LLC
Production reportsHeadington Energy Partners, LLCthrough Jun 2000
Latest permitExxon Corp.Nov 18, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,700
total depth, ft
1
permits on file
Nov 18, 1996
last permit issued
May 6, 1997
completed
10
cumulative oil, bbl
7.51K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2000 THROUGH Jun 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 6, 1997
Shut in
—
Plugged
Dec 29, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sarita Field Oil & Gas Unit O-4-10608WildcatHeadington Energy Partners, LLC10107.51KJan 1993 – Jun 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Mobil CorporationJun 2000 → Jun 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
455254-99DrillExxon Corp.Nov 18, 1996Nov 18, 1996Dec 25, 199610,700

Completions

CompletedLeaseFieldOperatorStatusDepth
May 6, 1997Sarita Field Oil & Gas Unit O-4-10608WildcatHeadington Energy Partners LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 53 ft elevation.Download CSV →

FormationMD ftSubsea
2-A1,910-1,857
2-F2,810-2,757
2-M3,310-3,257

Perforations

Perforated and open-hole intervals.

FromToType
10,11910,124Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,60717.52,175 S
5.59,456—214 S
9.6259,47912.25985 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 30, 1998Dec 18, 1997Yes
00Jan 2, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26131174, documented in the API reference.