TEXAS · WELLS · KENEDY COUNTY · API 42-261-31203 · DISTRICT 04
Mrs. S. K. East B #51
Kenedy County · Sarita East (O-Sand) field · Vertical
Mrs. S. K. East B #51 (API 42-261-31203) is a plugged well in Kenedy County, plugged November 12, 2013, last operated by Headington Oil Company LLC.
The RRC has issued 3 drilling permits between 1998 and 2004, permitted to 14,850 ft.
It was permitted by Exxon Mobil Corporation and has since transferred to Headington Oil Company LLC on the wellbore schedule.
Completion filings report one formation top, including Nb Marker.
Operator of record
Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 29, 2015
- Permits on file
- 45
- Phone
- (214) 696-0606
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Headington Oil Company LLC |
| Production reports | Exxon Mobil Corporationthrough Jun 2004 |
| Latest permit | Exxon Mobil CorporationJan 28, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,850
- total depth, ft
- 3
- permits on file
- Jan 28, 2004
- last permit issued
- May 19, 1999
- completed
- 0
- cumulative oil, bbl
- 4.5M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1999 THROUGH May 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 19, 1999
- Shut in
- —
- Plugged
- Nov 12, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mrs. S. K. East "B" G-4-172531 | Sarita, East (Frio) | Headington Oil Company LLC | 1 | 0 | 852K | Mar 1999 – May 2014 |
| Mrs. S. K. East "B" G-4-172323 | Sarita, East (O-Sand) | Headington Oil Company LLC | 1 | 0 | 3.65M | Jan 1999 – Nov 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1999 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Jun 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 540720-99 | Recompletion | Exxon Mobil Corporation | Jan 13, 2004 | Jan 28, 2004 | — | 14,700 |
| 484240-99 | Recompletion | Exxon Corp. | May 3, 1999 | May 3, 1999 | May 7, 1999 | 14,631 |
| 476793-99 | Drill | Exxon Corp. | Jun 2, 1998 | Jun 2, 1998 | Jun 25, 1998 | 14,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 19, 1999 | Mrs. S. K. East B G-4-172323 | Sarita East (O-Sand) | Headington Oil Company LLC | Plugged | — |
| May 19, 1999 | Mrs. S. K. East B G-4-172323 | Sarita East (O-Sand) | Headington Oil Company LLC | Plugged | — |
| Mar 15, 1999 | Mrs. S. K. East B G-4-172531 | Sarita East (Frio) | Headington Energy Partners LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 39 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| NB Marker | 10,170 | -10,131 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,072 | 12,080 | Perforated |
| 12,096 | 12,116 | Perforated |
| 12,130 | 12,152 | Perforated |
| 12,538 | 12,564 | Perforated |
| 14,236 | 14,250 | Perforated |
| 14,476 | 14,500 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 3,019 | 20 | 2,535 S |
| 11.75 | 10,208 | 14.75 | 1,220 S |
| 9.875 | 10,208 | 11.75 | 297 S |
| 9.875 | 10,695 | 11.75 | 297 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 30, 1999 | Jun 22, 1999 | Yes |
| 00 | May 19, 1999 | Apr 9, 1999 | — |
| 00 | Apr 29, 1999 | Mar 17, 1999 | — |
| 00 | Apr 28, 1999 | — | — |
| 00 | Apr 20, 1999 | Mar 8, 1999 | Yes |
| 00 | Apr 7, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-31203 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-31203 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26131203, documented in the API reference.