TEXAS · WELLS · KENEDY COUNTY · API 42-261-31332 · DISTRICT 04
Santa FE Ranch Mula Pasture #51
Kenedy County · Stillman (J-00 K-78) field · Directional
Santa FE Ranch Mula Pasture #51 (API 42-261-31332) is a plugged well in Kenedy County, plugged April 1, 2013, last operated by Exxon Mobil Corporation.
The RRC has issued 3 drilling permits between 2003 and 2008, permitted to 12,500 ft.
Completion filings report 6 formation tops, including E 59, E59, F 61, F61.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 15, 2026
- Permits on file
- 1,223
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | Exxon Mobil Corporationthrough Feb 2006 |
| Latest permit | Exxon Mobil CorporationApr 25, 2008 |
- 12,500
- total depth, ft
- 3
- permits on file
- Apr 25, 2008
- last permit issued
- May 6, 2008
- completed
- 0
- cumulative oil, bbl
- 619K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2003 THROUGH Mar 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 6, 2008
- Shut in
- —
- Plugged
- Apr 1, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Santa FE Ranch Mula Pasture G-4-239638 | Stillman (J-00, K-78) | Exxon Mobil Corporation | 1 | 0 | 0 | May 2008 – Mar 2013 |
| Santa FE Ranch Mula Pasture G-4-233329 | Tordilla-NC (K-45, E) | Exxon Mobil Corporation | 1 | 0 | 0 | Nov 2007 – May 2008 |
| Santa FE Ranch Mula Pasture G-4-199082 | Stillman (K-00) | Exxon Mobil Corporation | 1 | 0 | 619K | Dec 2003 – Nov 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Mobil CorporationDec 2003 → Feb 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 659274-99 | Recompletion | Exxon Mobil Corporation | Apr 9, 2008 | Apr 25, 2008 | Apr 30, 2008 | 10,260 |
| 646544-99 | Recompletion | Exxon Mobil Corporation | Sep 21, 2007 | Sep 26, 2007 | Nov 1, 2007 | 11,000 |
| 535475-99 | Drill | Exxon Mobil Corporation | Aug 18, 2003 | Aug 20, 2003 | Sep 17, 2003 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 6, 2008 | Santa FE Ranch Mula Pasture G-4-239638 | Stillman (J-00 K-78) | Exxon Mobil Corporation | Plugged | — |
| Nov 29, 2007 | Santa FE Ranch Mula Pasture G-4-233329 | Tordilla-NC (K-45 E) | Exxon Mobil Corporation | Plugged | — |
| Feb 27, 2006 | Santa FE Ranch Mula Pasture G-4-199082 | Stillman (K-00) | Exxon Mobil Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 45 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| E 59 | 5,576 | -5,531 |
| E59 | 5,576 | -5,531 |
| F 61 | 6,501 | -6,456 |
| F61 | 6,501 | -6,456 |
| H 23 | 8,335 | -8,290 |
| H23 | 8,335 | -8,290 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,168 | 10,176 | Perforated |
| 10,276 | 10,452 | Perforated |
| 10,900 | 11,097 | Perforated |
| 11,030 | 11,068 | Perforated |
| 11,161 | 11,171 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,417 | 17.5 | 2,381 S |
| 9.875 | 9,818 | 12.25 | 3,080 S |
| 3.5 | 11,415 | 6.5 | 760 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 24, 2008 | Jun 11, 2008 | Yes |
| 00 | Oct 4, 2008 | — | — |
| 00 | Mar 3, 2008 | Jan 4, 2008 | Yes |
| 00 | Feb 27, 2008 | — | — |
| 00 | Jan 8, 2007 | Apr 14, 2006 | — |
| 00 | Oct 7, 2004 | Aug 27, 2004 | — |
| 00 | Mar 10, 2004 | Jan 7, 2004 | Yes |
| 00 | Feb 12, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-31332 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-31332 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26131332, documented in the API reference.