TEXAS · WELLS · KENEDY COUNTY · API 42-261-31544 · DISTRICT 04
Kleberg R J Jr TR Stillman #505
Kenedy County · Tordilla (Deep Cons.) field · Directional
Kleberg R J JR TR Stillman #505 (API 42-261-31544) is a plugged well in Kenedy County, plugged July 14, 2016, last operated by Eog Resources Inc..
The RRC has issued 2 drilling permits between 2010 and 2011, permitted to 13,000 ft.
Completion filings report 5 formation tops, including Frio, K-45, K45, K-88.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 2, 2025
- Permits on file
- 16,354
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Dec 2011 |
| Latest permit | EOG Resources, Inc.Mar 23, 2011 |
- 13,000
- total depth, ft
- 2
- permits on file
- Mar 23, 2011
- last permit issued
- Jan 6, 2012
- completed
- 0
- cumulative oil, bbl
- 1.64M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2010 THROUGH Jul 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 6, 2012
- Shut in
- —
- Plugged
- Jul 14, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kleberg, R J Jr TR Stillman G-4-258933 | Tordilla (K-45) | EOG Resources, Inc. | 1 | 0 | 1.64M | Dec 2010 – Jul 2016 |
| Kleberg, R J Jr TR Stillman G-4-268003 | Tordilla-NC (K-88, E) | EOG Resources, Inc. | 1 | 0 | 0 | Jan 2012 – Mar 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Dec 2010 → Dec 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 712429-99 | Recompletion | EOG Resources, Inc. | Mar 21, 2011 | Mar 23, 2011 | Dec 15, 2011 | 11,280 |
| 700348-99 | Drill | EOG Resources, Inc. | Aug 5, 2010 | Aug 9, 2010 | Sep 18, 2010 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 6, 2012 | Kleberg R J Jr TR Stillman G-4-258933 | Tordilla (Deep Cons.) | EOG Resources Inc. | Plugged | — |
| Jan 6, 2012 | Kleberg R J Jr TR Stillman G-4-268003 | Tordilla-NC (K-88 E) | EOG Resources Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 43 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,334 | 10,368 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,516 | 14.75 | 1,640 S |
| 4.5 | 9,085 | 5.25 | 490 S |
| 7.625 | 9,665 | 9.875 | 1,100 S |
| 4.5 | 11,280 | 5.25 | 490 S |
| 3.5 | 11,280 | 5.25 | 490 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 29, 2013 | Oct 21, 2013 | Yes |
| 00 | Jun 3, 2013 | May 14, 2012 | — |
| 00 | Apr 26, 2013 | May 14, 2012 | — |
| 00 | Feb 18, 2011 | Jan 6, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-31544 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-31544 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26131544, documented in the API reference.