WELL · 42-263-00150 · DISTRICT 8

S-M-S /Canyon Sand/ Unit #2D

Plugged

Kent County · S-M-S (Canyon Sand) field  · Vertical

S-M-S /Canyon Sand/ Unit #2D (API 42-263-00150) is a plugged well in Kent County, plugged November 14, 1984, last operated by J-R Oil Inc..

The RRC has issued one drilling permit (amended once), issued April 7, 1994, permitted to 7,500 ft.

It was permitted by Dynamic Production, Inc. and has since transferred to J-R Oil Inc. on the wellbore schedule.

Completion filings report one formation top, including Canyon.

Its lease has reported 32.1K barrels of oil since July 1997, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

J-R Oil Inc.

Permitted by Dynamic Production, Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Aug 6, 2004

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ-R Oil Inc.
Production reportsDynamic Production, Inc.through Mar 2008
Latest permitDynamic Production, Inc.Apr 7, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
2
permits on file
Apr 7, 1994
last permit issued
—
completed
32.1K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 14, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maben O-11-67756S-M-S (Canyon Sand)Dynamic Production, Inc.332.1K0Jul 1997 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dynamic Production, Inc.Jul 1997 → Mar 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
422801-98RecompletionDynamic Production, Inc.Jul 24, 1998Apr 7, 1994Apr 15, 19947,182
422801-99OtherRocker a Operating CompanyApr 7, 1994Apr 7, 1994—7,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67756————
—— O-11-67756————

Formation tops

As filed on W-2/G-1. Subsea from 2,176 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON SAND6,122-3,946
CanyonCANYON REEF6,730-4,554

Perforations

Perforated and open-hole intervals.

FromToType
5,0705,106Perforated
6,1226,141Perforated
6,7306,900Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7519915230 S
8.6251,517111,150 S
5.56,1867.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 10, 2008May 13, 2008—
00Apr 23, 2003Aug 13, 1998—
00Feb 15, 2000Jun 29, 1998Yes
00Aug 19, 1998Jun 29, 1998Yes
00Aug 4, 1998——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.06M
bbl, all reported
May 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088106H-1 InjectionPlugged Sep 20, 20133,0002,5006,100–6,141
000082773H-1 InjectionPlugged Sep 20, 20135002,0006,730–6,900

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26300150, documented in the API reference.