WELL · 42-263-30834 · DISTRICT 8

Sellars 37 #1

Plugged

Kent County · Polar (Ellen.) field  · Vertical

Sellars 37 #1 (API 42-263-30834) is a plugged well in Kent County, plugged April 17, 1998, last operated by Patterson Petroleum Inc..

The RRC has issued one drilling permit, issued November 18, 1981, permitted to 7,800 ft.

It was permitted by Maralo, Inc. and has since transferred to Patterson Petroleum Inc. on the wellbore schedule.

Operator of record

Patterson Petroleum Inc.

Permitted by Maralo, Inc.; the EWA schedule now lists a different operator.

Based in
Snyder, TX
P-5 status
Inactive (I)
P-5 last filed
Oct 4, 1999
Permits on file
436
Phone
(325) 573-1938

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePatterson Petroleum Inc.
Production reportsnone
Latest permitMaralo, Inc.Nov 18, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,800
total depth, ft
1
permits on file
Nov 18, 1981
last permit issued
Jan 10, 1982
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 10, 1982
Shut in
—
Plugged
Apr 17, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sellars "37" O-11-63668Polar (Ellen.)Patterson Petroleum, Inc.100Jan 1993 – May 1998

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
141032-99DrillMaralo, Inc.Nov 18, 1981Nov 18, 1981Dec 9, 19817,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-63668————

Perforations

Perforated and open-hole intervals.

FromToType
—7,788Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,890111,400 S
5.57,7657.8751,600 S
2.3757,775——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jan 19, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26330834, documented in the API reference.