WELL · 42-263-30915 · DISTRICT 8
Hinkle 84 #2
Kent County · Wallace Ranch NE. (Noodle Creek) field · Vertical
Hinkle 84 #2 (API 42-263-30915) is a plugged well in Kent County, plugged February 14, 1991, last operated by Smith Bros. Casing Pullers Inc..
The RRC has issued one drilling permit, issued October 13, 1982, permitted to 4,000 ft.
It was permitted by Hinkle Exploration Ltd. and has since transferred to Smith Bros. Casing Pullers Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Vale Shale, Arroyo, Coleman Junction, Dotham.
Operator of record
Smith Bros. Casing Pullers Inc.
Permitted by Hinkle Exploration Ltd.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 5, 1998
- Phone
- (432) 683-9722
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Bros. Casing Pullers Inc. |
| Production reports | none |
| Latest permit | Hinkle Exploration Ltd.Oct 13, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Oct 13, 1982
- last permit issued
- Jan 2, 1988
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 2, 1988
- Shut in
- —
- Plugged
- Feb 14, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-11-64347 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 174199-99 | Drill | Hinkle Exploration Ltd. | Oct 13, 1982 | Oct 13, 1982 | Oct 28, 1982 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-64347 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Vale Shale | 2,142 |
| Arroyo | 2,240 |
| Coleman Junction | 3,448 |
| Dotham | 3,644 |
| Noodle Creek (Top) | 3,820 |
| Noodle Creek (Pay) | 3,860 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,646 | 3,700 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 330 | 11.75 | 375 S |
| 4.5 | 3,950 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 1, 1988 | Jan 15, 1988 | — |
| 00 | Jun 29, 1984 | Jun 11, 1984 | — |
| 00 | Jun 26, 1984 | Jun 11, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-30915 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-30915 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 58.8K
- bbl, all reported
- Aug 1988
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000052450 | W-14 Disposal | Plugged Feb 25, 1991 | 1,000 | 700 | 3,644–3,712 |
MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26330915, documented in the API reference.