TEXAS · WELLS · KENT COUNTY · HAMLIN WATERFLOOD UNIT LEASE · API 42-263-30966 · DISTRICT 7B
Hamlin Waterflood Unit #1
Kent County · Wallace Ranch NE. (Noodle Creek) field · Vertical
Hamlin Waterflood Unit #1 (API 42-263-30966) is a plugged well in Kent County, plugged July 21, 1994, last operated by Dickson Petroleum Inc..
The RRC has issued 2 drilling permits in 1983, permitted to 4,100 ft.
It was permitted by Saxon Oil Company and has since transferred to Dickson Petroleum Inc. on the wellbore schedule.
Its lease has reported 3.74K barrels of oil and 14 mcf of gas since January 1993, last reporting in September 1994. The lease carries 9 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Saxon Oil Company; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 25, 2000
- Permits on file
- 17
- Phone
- (432) 686-9559
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Dickson Petroleum, Inc.through Jun 1994 |
| Latest permit | Saxon Oil CompanySep 2, 1983 |
- 4,100
- total depth, ft
- 2
- permits on file
- Sep 2, 1983
- last permit issued
- Sep 21, 1983
- completed
- 3.74K
- cumulative oil, bbl
- 14
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 21, 1983
- Shut in
- —
- Plugged
- Jul 21, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hamlin Waterflood Unit O-11-66107 | Wallace Ranch,ne. (Noodle Creek) | Dickson Petroleum, Inc. | 9 | 3.74K | 14 | Jan 1993 – Sep 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dickson Petroleum, Inc.Jan 1993 → Jun 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 209548-99 | Drill | Saxon Oil Company | Aug 19, 1983 | Sep 2, 1983 | — | 4,100 |
| 205781-99 | Drill | Saxon Oil Company | Aug 9, 1983 | Aug 16, 1983 | Sep 6, 1983 | 4,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 21, 1983 | Hamlin B O-11-64541 | Wallace Ranch NE. (Noodle Creek) | Saxon Oil Company | Plugged | — |
| Sep 21, 1983 | Hamlin Waterflood Unit O-11-66107 | Wallace Ranch NE. (Noodle Creek) | Dickson Petroleum Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,862 | 3,866 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 329 | 12.5 | 300 S |
| 2.375 | 3,902 | — | — |
| 4.5 | 3,960 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 13, 1988 | Oct 18, 1983 | — |
| 00 | Jan 8, 1988 | — | — |
| 00 | Jan 12, 1984 | Oct 18, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-30966 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-30966 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26330966, documented in the API reference.