TEXAS · WELLS · KENT COUNTY · JONES, PERCY LEASE · API 42-263-31509 · DISTRICT 7B
Jones Percy #1111
Kent County · Salt Creek field · Vertical
Jones Percy #1111 (API 42-263-31509) is a plugged well in Kent County, plugged May 31, 2019, last operated by Oxy USA Wtp LP.
The RRC has issued one drilling permit, issued October 26, 1993, permitted to 7,000 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Oxy USA Wtp LP on the wellbore schedule.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Permits on file
- 2,289
- Phone
- (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | OXY USA WTP LP |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.Oct 26, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- Oct 26, 1993
- last permit issued
- Aug 18, 1994
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Jan 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 18, 1994
- Shut in
- —
- Plugged
- May 31, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jones, Percy O-11-67291 | Salt Creek | OXY USA WTP LP | 1 | 0 | 0 | Aug 1994 – Jan 2020 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 417467-99 | Drill | Mobil Producing TX. & N.M. Inc. | Oct 25, 1993 | Oct 26, 1993 | Jul 23, 1994 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 18, 1994 | Jones Percy O-11-67291 | Salt Creek | OXY USA WTP LP | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,754 | 4,874 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,503 | 12.25 | 1,425 S |
| 7 | 5,030 | 8.75 | 725 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 25, 1994 | Sep 27, 1994 | Yes |
| 00 | Oct 5, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-31509 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-31509 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 6.88M
- bbl, all reported
- May 2020
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000081755 | W-14 Disposal | Plugged Jun 19, 2019 | 20,000 | 1,500 | 3,700–4,900 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26331509, documented in the API reference.