TEXAS · WELLS · KENT COUNTY · API 42-263-31816 · DISTRICT 7B
Girard (Tannehill) Unit #2
Kent County · Long-Hall (Tannehill) field · Producing · Vertical
Girard (Tannehill) Unit #2 (API 42-263-31816) is a well in Kent County operated by Sojourner Drilling Corporation, completed April 20, 2008 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued February 22, 2008, permitted to 4,420 ft.
It was permitted by Halliburton Operating Company and has since transferred to Sojourner Drilling Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including B/C. Junction, Noodle Creek, Saddle Creek.
Its 2 leases have reported 275K barrels of oil since April 2008, last reporting volume in April 2026. The leases carry 10 wells, so these are lease totals, not this well alone.
Operator of record
Sojourner Drilling Corporation
Permitted by Halliburton Operating Company; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 7, 2025
- Permits on file
- 872
- Phone
- (325) 672-2832
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sojourner Drilling Corporation |
| Production reports | Sojourner Drilling Corporationthrough Apr 2026 |
| Latest permit | Halliburton Operating CompanyFeb 22, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,420
- total depth, ft
- 1
- permits on file
- Feb 22, 2008
- last permit issued
- Apr 20, 2008
- completed
- 275K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2008 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 20, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Girard (Tannehill) Unit O-11-70738 | Long-Hall (Tannehill) | Sojourner Drilling Corporation | 9 | 202K | 0 | Aug 2018 – Apr 2026 |
| Alta Jean O-11-69238 | Long-Hall (Tannehill) | Sojourner Drilling Corporation | 1 | 73K | 0 | Apr 2008 – Jul 2018 |
Oil, barrels lease total
Last 12 months 33,457 · prior 12 40,363(-17%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Halliburton Operating CompanyApr 2008 → May 2012
- 2Sojourner Drilling CorporationJun 2012 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 655314-99 | Drill | Halliburton Operating Company | Feb 14, 2008 | Feb 22, 2008 | Mar 5, 2008 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 20, 2008 | Girard (Tannehill) Unit O-11-70738 | Long-Hall (Tannehill) | Sojourner Drilling Corporation | Producing | 4,420 |
| Apr 20, 2008 | Alta Jean O-11-69238 | Long-Hall (Tannehill) | Sojourner Drilling Corporation | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,141 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/C. Junction | 3,528 | -1,387 |
| Noodle Creek | 4,156 | -2,015 |
| Saddle Creek | 4,335 | -2,194 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,305 | 4,309 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 310 | 17.5 | 400 S |
| 5.5 | 4,382 | 7.875 | 265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 11, 2018 | Jun 6, 2008 | Yes |
| 00 | Jul 1, 2008 | Jun 6, 2008 | Yes |
| 00 | Jun 26, 2008 | — | — |
Well logs
2 logs loaded from the RRC's log index, the latest received Jun 27, 2011. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| NEUTRON/DENSITY POROSITYSpans B/C. Junction, Noodle Creek, Saddle Creek | TIFF | 3,400 to 4,400 | Jun 27, 2011run Mar 12, 2008 | 1.78 |
| RESISTIVITYSpans B/C. Junction, Noodle Creek, Saddle Creek | TIFF | 70 to 4,410 | Jun 27, 2011run Mar 12, 2008 | 6.68 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-31816 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-31816 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26331816, documented in the API reference.