TEXAS · WELLS · KENT COUNTY · SMITHEY SOUTH UNIT LEASE · API 42-263-31916 · DISTRICT 7B

Smithey South Unit #1

Y

Kent County · Long-Hall (Tannehill) field · Producing  · Vertical

Smithey South Unit #1 (API 42-263-31916) is a well in Kent County operated by R2q Operating LLC, completed June 24, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 27, 2010, permitted to 4,400 ft.

It was permitted by Cholla Petroleum, Inc. and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including B/Coleman Junction, B/Stockwether.

Its lease has reported 109K barrels of oil since June 2010, last reporting volume in March 2026.

Operator of record

R2Q Operating LLC

Permitted by Cholla Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Iowa Park, TX
P-5 status
Active – Extension (X)
P-5 last filed
Sep 12, 2025
Permits on file
38
Phone
(940) 228-1500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsExtex Operating Companythrough Mar 2026
Latest permitCholla Petroleum, Inc.May 27, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,400
total depth, ft
1
permits on file
May 27, 2010
last permit issued
Jun 24, 2010
completed
109K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2010 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 24, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smithey South Unit O-11-69575Long-Hall (Tannehill)Extex Operating Company1109K0Jun 2010 – Mar 2026

Oil, barrels lease total

Last 12 months 3,407 · prior 12 423

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cholla Petroleum, Inc.Jul 2010 → Feb 2026
  2. 2Extex Operating CompanyMar 2026 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
693180-99DrillCholla Petroleum, Inc.Mar 19, 2010May 27, 2010Jun 8, 20104,999

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 24, 2010Smithey South Unit O-11-69575Long-Hall (Tannehill)R2Q Operating LLCProducing4,400

Formation tops

As filed on W-2/G-1. Subsea from 2,090 ft elevation.Download CSV →

FormationMD ftSubsea
B/Coleman Junction3,525-1,435
B/Stockwether4,237-2,147

Perforations

Perforated and open-hole intervals.

FromToType
4,2784,284Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37533617.5400 S
8.6251,27612.25150 S
5.54,4007.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 27, 2010Jun 30, 2010Yes
00Sep 21, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26331916, documented in the API reference.