WELL · 42-263-32009 · DISTRICT 8
Double Mountain 57 #1
Kent County · Double Mountain (Canyon Sand) field · Water Supply · Vertical
Double Mountain 57 #1 (API 42-263-32009) is a well in Kent County operated by Sharp Image Energy Inc., completed March 23, 2018 and listed as water supply on the RRC schedule.
The RRC has issued one drilling permit, issued May 14, 2012, permitted to 7,700 ft.
Completion filings report 3 formation tops, including Stockwether, Noodle Creek, Canyon.
Its lease has reported 6.87K barrels of oil since July 2012, last reporting in July 2026.
Operator of record
Big Spring, TX · P-5 Active, filed Jul 16, 2026 · 665 permits on file · (432) 267-3126
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sharp Image Energy Inc. |
| Production reports | Sharp Image Energy, Inc.through Jan 2016 |
| Latest permit | Sharp Image Energy, Inc.May 14, 2012 |
- 7,700
- total depth, ft
- 1
- permits on file
- May 14, 2012
- last permit issued
- Mar 23, 2018
- completed
- 6.87K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 23, 2018
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Double Mountain 57 O-11-69912 | Double Mountain (Canyon Sand) | Sharp Image Energy, Inc. | 1 | 6.87K | 0 | Jul 2012 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sharp Image Energy, Inc.Aug 2012 → Jan 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 739677-99 | Drill | Sharp Image Energy, Inc. | May 1, 2012 | May 14, 2012 | May 20, 2012 | 7,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69912 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,125 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,019 | 6,023 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 319 | 17.5 | 375 S |
| 8.625 | 1,833 | 11 | 1,175 S |
| 5.5 | 6,288 | 7.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 21, 2018 | Oct 9, 2018 | — |
| 00 | Jan 31, 2013 | Jul 24, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-32009 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-32009 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000112099 | H-1 Injection | Not activated | 5,000 | 3,005 | 6,010–6,220 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26332009, documented in the API reference.