WELL · 42-269-31089 · DISTRICT 8
Burnett S. B. Estate GG #19
King County · GG (Conglomerate) field · Vertical
Burnett S. B. Estate GG #19 (API 42-269-31089) is a plugged well in King County, plugged June 29, 2006, last operated by Hunt Oil Company.
The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 5,900 ft.
It was permitted by Taubert, Steed, Gunn & Medders and has since transferred to Hunt Oil Company on the wellbore schedule.
Completion filings report 5 formation tops, including Saddle Creek, Cisco, Twin Peaks Sand, Conglomerate.
Operator of record
Permitted by Taubert, Steed, Gunn & Medders; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 20, 2026
- Permits on file
- 1,472
- Phone
- (214) 978-8000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hunt Oil Company |
| Production reports | none |
| Latest permit | Taubert, Steed, Gunn & MeddersAug 3, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,900
- total depth, ft
- 2
- permits on file
- Aug 3, 1984
- last permit issued
- Sep 23, 1983
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 23, 1983
- Shut in
- —
- Plugged
- Jun 29, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Burnett, S. B. Estate "GG" O-11-64913 | GG (Conglomerate) | Hunt Oil Company | 5 | 0 | 0 | Jan 1993 – Mar 2007 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 247298-99 | Drill | Taubert, Steed, Gunn & Medders | Jul 23, 1984 | Aug 3, 1984 | — | 5,900 |
| 187156-99 | Drill | Taubert, Steed, Gunn & Medders | Feb 10, 1983 | Feb 10, 1983 | — | 5,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-64913 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,832 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Saddle CreekSADDLE CREEK LIME | 2,988 | -1,156 |
| CiscoCISCO REEF | 3,578 | -1,746 |
| Twin Peaks Sand | 5,286 | -3,454 |
| Conglomerate | 5,896 | -4,064 |
| Mississippian | 5,918 | -4,086 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,898 | 5,900 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 263 | 12.25 | 300 S |
| 2.375 | 5,848 | — | — |
| 4.5 | 5,970 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 17, 1984 | Jul 23, 1984 | — |
| 00 | Aug 15, 1984 | Jul 23, 1984 | — |
| 00 | Jan 12, 1984 | Sep 30, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-31089 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-31089 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26931089, documented in the API reference.