TEXAS · WELLS · KING COUNTY · API 42-269-31122 · DISTRICT 7B
Burnett S.B. Est. 1A/2A Sand #46
King County · Twin Peaks (Strawn UP) field · Vertical
Burnett S.B. Est. 1a/2a Sand #46 (API 42-269-31122) is a plugged well in King County, plugged May 19, 2010, last operated by Hunt Oil Company.
The RRC has issued 3 drilling permits between 1983 and 1991, permitted to 6,000 ft.
It was permitted by Pacific Enterprises Oil CO.(USA) and has since transferred to Hunt Oil Company on the wellbore schedule.
Completion filings report 9 formation tops, including Stockweather, Stockwether, Cisco, Twin Peaks Sand.
Its 4 leases have reported 7.1M barrels of oil and 477K mcf of gas since January 1993, last reporting in March 2013. The leases carry 135 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Pacific Enterprises Oil Co.(usa); the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 20, 2026
- Permits on file
- 1,472
- Phone
- (214) 978-8000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hunt Oil Companythrough Sep 2012 |
| Latest permit | Pacific Enterprises Oil Co.(usa)Feb 8, 1991 |
- 6,000
- total depth, ft
- 3
- permits on file
- Feb 8, 1991
- last permit issued
- Apr 13, 1992
- completed
- 7.1M
- cumulative oil, bbl
- 477K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 13, 1992
- Shut in
- —
- Plugged
- May 19, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 135 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Burnett, S. B. Estate O-11-66571 | Anne Tandy (Strawn 5400) | Hunt Oil Company | 106 | 5.6M | 343K | Jan 1993 – Mar 2013 |
| Burnett, S.B. Est. "1A/2A Sand" O-11-67602 | Twin Peaks (Strawn, UP) | Hunt Oil Company | 22 | 1.33M | 107K | Oct 1995 – Mar 2013 |
| Burnett, S. B. Estate "YA" O-11-65213 | Twin Peaks (Strawn, UP) | Hunt Oil Company | 7 | 168K | 26.8K | Jan 1993 – Nov 1996 |
| — O-11-61380 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hunt Oil CompanyJan 1993 → Sep 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 376706-99 | Recompletion | Pacific Enterprises Oil Co.(usa) | Aug 16, 1990 | Feb 8, 1991 | Apr 5, 1992 | 6,000 |
| 225660-99 | Drill | Taubert, Steed, Gunn & Medders | Nov 23, 1983 | Dec 28, 1983 | — | 6,000 |
| 191794-99 | Drill | Taubert, Steed, Gunn & Medders | Feb 3, 1983 | Apr 18, 1983 | Nov 19, 1983 | 5,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 13, 1992 | Burnett S.B. Est. 1A/2A Sand O-11-67602 | Twin Peaks (Strawn UP) | Hunt Oil Company | Plugged | — |
| Apr 13, 1992 | Burnett S. B. Estate YA O-11-65213 | Twin Peaks (Strawn UP) | Hunt Oil Company | Plugged | — |
| Jan 21, 1984 | Burnett S. B. Estate YA O-11-61380 | Anne Tandy (Strawn 5400) | Pacific Enterprises Oil Co.(usa) | Plugged | — |
| Jan 21, 1984 | Burnett S. B. Estate O-11-66571 | Anne Tandy (Strawn 5400) | Hunt Oil Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,702 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Stockweather | 3,265 | -1,563 |
| Stockwether | 3,265 | -1,563 |
| CiscoCISCO REEF | 3,492 | -1,790 |
| Twin Peaks Sand | 5,170 | -3,468 |
| Dolite Lime | 5,200 | -3,498 |
| Oolitic Lime | 5,200 | -3,498 |
| Anne Tandy Sand | 5,232 | -3,530 |
| T.D. | 5,880 | -4,178 |
| TD | 5,880 | -4,178 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,142 | 5,149 | Perforated |
| 5,145 | 5,152 | Perforated |
| 5,166 | 5,174 | Perforated |
| 5,169 | 5,177 | Perforated |
| 5,398 | 5,408 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 262 | 12.25 | 200 S |
| 4.5 | 5,875 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 10, 1999 | Jul 30, 1999 | — |
| 00 | Sep 9, 1996 | May 6, 1992 | Yes |
| 00 | Jun 11, 1992 | May 6, 1992 | Yes |
| 00 | May 21, 1992 | Feb 3, 1984 | — |
| 00 | Feb 28, 1984 | Feb 3, 1984 | — |
| 00 | Feb 14, 1984 | Feb 3, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-31122 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-31122 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 9.1K
- bbl, last 12 reported months
- 732K
- bbl, all reported
- Apr 2010
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000088947 | H-1 Injection | Plugged May 27, 2010 | 1,400 | 2,170 | 4,340–5,220 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 9,104 · prior 12 44,346(-79%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26931122, documented in the API reference.