WELL · 42-269-32197 · DISTRICT 7

Johnson Fannie Mae #2

Plugged

King County · Katz (5100) field  · Vertical

Johnson Fannie Mae #2 (API 42-269-32197) is a plugged well in King County, plugged February 3, 2016, last operated by Gunn Oil Company.

The RRC has issued one drilling permit, issued September 18, 1995, permitted to 6,000 ft.

Completion filings report 12 formation tops, including B. Coleman Junction, B/Coleman Junction, T. Cisco Reef, T/Cisco Reef.

Its lease has reported 494K barrels of oil and 118K mcf of gas since June 1995, last reporting in June 2016. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Gunn Oil Company

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Apr 22, 2026
Permits on file
743
Phone
(940) 723-5585

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGunn Oil Company
Production reportsGunn Oil Companythrough Jan 2014
Latest permitGunn Oil CompanySep 18, 1995
6,000
total depth, ft
1
permits on file
Sep 18, 1995
last permit issued
Nov 6, 1995
completed
494K
cumulative oil, bbl
118K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1995 THROUGH Jun 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 6, 1995
Shut in
—
Plugged
Feb 3, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson, Fannie Mae O-8-27610Katz (5100)Gunn Oil Company5494K118KJun 1995 – Jun 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gunn Oil CompanyJun 1995 → Jan 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
439959-99DrillGunn Oil CompanySep 18, 1995Sep 18, 1995Oct 5, 19956,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27610————

Formation tops

As filed on W-2/G-1. Subsea from 1,576 ft elevation.Download CSV →

FormationMD ftSubsea
B. Coleman Junction2,114-538
B/Coleman Junction2,114-538
T. Cisco Reef3,295-1,719
T/Cisco Reef3,295-1,719
T. Twin Peaks SD5,035-3,459
T/Twin Peaks Sd.5,035-3,459
T. Anne Tandy Strawn5,118-3,542
T/Anne Tandy Strn.5,118-3,542
T. Strawn 5400 SD5,222-3,646
T/Strawn 5400 Sd.5,222-3,646
T. Bend Cong5,737-4,161
T/Bend Congl.5,737-4,161

Perforations

Perforated and open-hole intervals.

FromToType
5,2225,229Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62518612.25150 S
5.55,4247.875175 S
5.5—7.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 22, 2000Sep 7, 2000—
00Jan 11, 1996Dec 8, 1995Yes
00Dec 19, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.94M
bbl, all reported
Sep 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090332H-1 InjectionPlugged Feb 12, 20168501,7505,220–5,310

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 5,769(-100%)

01K2K3K20152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26932197, documented in the API reference.