WELL · 42-269-32351 · DISTRICT 8
Beadhead Emerger 65 #1
King County · Juniper (Bend Congl.) field · Temp Abandoned · Vertical
Beadhead Emerger 65 #1 (API 42-269-32351) is a well in King County operated by New Height Energy LLC, completed December 14, 1999 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued October 21, 1999, permitted to 6,000 ft.
It was permitted by Arrington,David H. Oil & Gas,Inc and has since transferred to New Height Energy LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Wolfcamp, Canyon, Bend.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Arrington,david H. Oil & Gas,inc; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Nov 4, 2025 · (432) 269-1562
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | New Height Energy LLC |
| Production reports | Relentless Permian Operating LLCthrough Jan 2020 |
| Latest permit | Arrington,david H. Oil & Gas,incOct 21, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Oct 21, 1999
- last permit issued
- Dec 14, 1999
- completed
- 0
- cumulative oil, bbl
- 356K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 14, 1999
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Beadhead Emerger 65 G-11-176776 | Juniper (Bend Congl.) | New Height Energy, LLC | 1 | 0 | 356K | Dec 1999 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arrington,david H. Oil & Gas,incDec 1999 → Mar 2002
- 2Trek Resources, Inc.Apr 2002 → Sep 2011
- 3Unitex Oil & Gas, L.L.C.Oct 2011 → Nov 2012
- 4PPC Operating Company LLCDec 2012 → Dec 2017
- 5Relentless Permian Operating LLCJan 2018 → Jan 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 487868-99 | Drill | Arrington,david H. Oil & Gas,inc | Sep 23, 1999 | Oct 21, 1999 | Oct 21, 1999 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-11-176776 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,790 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,844 | 5,852 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 393 | 12.25 | 250 S |
| 5.5 | 5,943 | 7.875 | 365 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 17, 2000 | Jan 19, 2000 | Yes |
| 00 | May 11, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-32351 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-32351 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26932351, documented in the API reference.