WELL · 42-269-32578 · DISTRICT 8
Walker South Unit #1
King County · Wichita Dome (Canyon) field · Vertical
Walker South Unit #1 (API 42-269-32578) is a plugged well in King County, plugged March 22, 2011, last operated by Bridwell Oil CO..
The RRC has issued one drilling permit, issued May 6, 2005, permitted to 6,500 ft.
Completion filings report 2 formation tops, including Canyon, Atoka.
Its lease has reported 2.95K barrels of oil since July 2005, last reporting in May 2012.
Operator of record
Wichita Falls, TX · P-5 Y, filed Nov 4, 2025 · 1,146 permits on file · (940) 632-8246
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bridwell Oil Co. |
| Production reports | Bridwell Oil Co.through Apr 2010 |
| Latest permit | Bridwell Oil Co.May 6, 2005 |
- 6,500
- total depth, ft
- 1
- permits on file
- May 6, 2005
- last permit issued
- Jul 12, 2005
- completed
- 2.95K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2005 THROUGH May 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 12, 2005
- Shut in
- —
- Plugged
- Mar 22, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Walker South Unit O-11-68790 | Wichita Dome (Canyon) | Bridwell Oil Co. | 1 | 2.95K | 0 | Jul 2005 – May 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bridwell Oil Co.Jul 2005 → Apr 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600212-99 | Drill | Bridwell Oil Co. | May 4, 2005 | May 6, 2005 | May 24, 2005 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-68790 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,785 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,376 | 4,379 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 329 | 12.25 | 250 S |
| 4.5 | 6,248 | 7.875 | 4,754 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 17, 2005 | Jul 26, 2005 | Yes |
| 00 | Sep 20, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-32578 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-32578 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26932578, documented in the API reference.