WELL · 42-269-32665 · DISTRICT 8
Foster #1A
King County · Tumbleweed NE. (Tannehill) field · Vertical
Foster #1A (API 42-269-32665) is a plugged well in King County, plugged April 7, 2022, last operated by Schalk Oil Company Inc..
The RRC has issued one drilling permit, issued October 4, 2006, permitted to 4,200 ft.
Completion filings report one formation top, including Tannehill.
Its lease has reported 153K barrels of oil since September 2005, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 3, 2026
- Permits on file
- 184
- Phone
- (940) 322-3424
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Schalk Oil Company Inc. |
| Production reports | Schalk Oil Company, Inc.through Apr 2026 |
| Latest permit | Schalk Oil Company, Inc.Oct 4, 2006 |
- 4,200
- total depth, ft
- 1
- permits on file
- Oct 4, 2006
- last permit issued
- Jul 24, 2007
- completed
- 153K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 24, 2007
- Shut in
- —
- Plugged
- Apr 7, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Foster O-11-68833 | Tumbleweed, NE. (Tannehill) | Schalk Oil Company, Inc. | 4 | 153K | 0 | Sep 2005 – Jul 2026 |
Oil, barrels lease total
Last 12 months 483 · prior 12 1,183(-59%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Schalk Oil Company, Inc.Sep 2005 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 626997-99 | Drill | Schalk Oil Company, Inc. | Oct 4, 2006 | Oct 4, 2006 | Oct 14, 2006 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-68833 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,146 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 3,978 | -1,832 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,977 | 3,998 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 378 | 17.5 | 550 S |
| 8.625 | 1,545 | 12.25 | 550 S |
| 5.5 | 4,065 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 14, 2008 | Jan 17, 2008 | Yes |
| 00 | Oct 8, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-269-32665 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-269-32665 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 603K
- bbl, all reported
- Apr 2022
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000098130 | H-1 Injection | Plugged Apr 18, 2022 | 1,000 | 1,700 | 3,400–3,998 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26932665, documented in the API reference.