WELL · 42-269-32918 · DISTRICT 8

Forks GGG #35

N

King County · Balt (Tannehill) field  · Vertical

Forks Ggg #35 (API 42-269-32918) is a well in King County operated by Medders Oil Company Inc., completed July 5, 2014.

The RRC has issued one drilling permit, issued June 4, 2014, permitted to 3,950 ft.

Completion filings report 10 formation tops, including Coleman Junction, Tannehill, Cisco, Bunger.

Its 2 leases have reported 2.61M barrels of oil and 12.4K mcf of gas since April 2001, last reporting in July 2026. The leases carry 84 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 8.15K barrels injected in the 12 months reported through April 2026.

Operator of record

Medders Oil Company Inc.

Wichita Falls, TX · P-5 Y, filed May 4, 2026 · 291 permits on file · (806) 422-1188

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMedders Oil Company Inc.
Production reportsMedders Oil Company, Inc.through Apr 2026
Latest permitMedders Oil Company, Inc.Jun 4, 2014
3,950
total depth, ft
1
permits on file
Jun 4, 2014
last permit issued
Jul 5, 2014
completed
2.61M
cumulative oil, bbl
12.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 5, 2014
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 84 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Forks South Balt Unit O-11-70869Balt (Tannehill)Medders Oil Company, Inc.53419K3.87KApr 2019 – Jul 2026
Forks GGG O-11-68304Balt (Tannehill)Medders Oil Company, Inc.312.19M8.52KApr 2001 – Aug 2021

Oil, barrels lease total

Last 12 months 79,015 · prior 12 54,425(+45%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 120 · prior 12 120(+0%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Medders Oil Company, Inc.Apr 2001 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
785684-99DrillMedders Oil Company, Inc.Apr 28, 2014Jun 4, 2014Jun 13, 20143,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68304————
—— O-11-70869————

Formation tops

As filed on W-2/G-1. Subsea from 1,973 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - POSSIBLE LOST3,215-1,242
Tannehill3,797-1,824
Cisco3,940-1,967
Bunger——
Caddo——
Canyon——
Conglomerate——
Des Moines——
Pennsylvanian——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
3,7983,806Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37522017.5300 S
8.62580212.25410 S
4.53,9607.875325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 14, 2026Oct 17, 2025—
00Apr 17, 2019Jun 18, 2015Yes
00Jun 23, 2015Jun 18, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

8.15K
bbl, last 12 reported months
8.15K
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000126732H-1 InjectionActive2,8001,8003,798–3,806

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 8,146

01K2K3K2026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26932918, documented in the API reference.