TEXAS · WELLS · KLEBERG COUNTY · API 42-273-00107 · DISTRICT 04
King Ranch Borregos #308
Kleberg County · Borregos (Consolidated Gas) field · Vertical
King Ranch Borregos #308 (API 42-273-00107) is a plugged well in Kleberg County, plugged January 20, 2012, last operated by Exxon Mobil Corporation.
The RRC has issued 5 drilling permits between 1981 and 1993, permitted to 7,354 ft.
It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.
Its 4 leases have reported 299 barrels of oil and 769K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 15, 2026
- Permits on file
- 1,223
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | Exxon Mobil Corporationthrough Feb 2010 |
| Latest permit | Exxon Corp.Sep 7, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,354
- total depth, ft
- 5
- permits on file
- Sep 7, 1993
- last permit issued
- Dec 13, 1999
- completed
- 299
- cumulative oil, bbl
- 769K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1996 THROUGH Feb 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 13, 1999
- Shut in
- —
- Plugged
- Jan 20, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Borregos G-4-136527 | Borregos (Consolidated Gas) | Exxon Mobil Corporation | 1 | 299 | 769K | Jan 1993 – Feb 2010 |
| King Ranch Borregos G-4-73715 | Borregos (Zone J-15,N) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – — |
| King Ranch Borregos G-4-75306 | Borregos (Zone R-2 N) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – — |
| — G-4-106992 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.May 1996 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Feb 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 415733-99 | Recompletion | Exxon Corp. | Sep 7, 1993 | Sep 7, 1993 | — | 5,725 |
| 366485-99 | Recompletion | Exxon Corp. | Nov 15, 1989 | Nov 17, 1989 | — | 7,354 |
| 263661-99 | Recompletion | Exxon Corp. | Jan 7, 1985 | Jan 7, 1985 | — | 7,354 |
| 169927-99 | Recompletion | Exxon Corp. | Aug 23, 1982 | Aug 23, 1982 | — | 7,350 |
| 129827-99 | Recompletion | Exxon Corp. | Aug 12, 1981 | Aug 12, 1981 | — | 7,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 13, 1999 | King Ranch Borregos G-4-136527 | Borregos (Consolidated Gas) | Exxon Mobil Corporation | Plugged | — |
| Sep 24, 1985 | King Ranch Borregos G-4-73715 | Borregos (Zone J-15 N) | Exxon Corp. | Plugged | — |
| Jun 6, 1983 | King Ranch Borregos G-4-106992 | Borregos (Zone R-13) | Exxon Corp. | Plugged | — |
| Apr 6, 1977 | King Ranch Borregos G-4-75306 | Borregos (Zone R-2 N) | Exxon Corp. | Plugged | — |
| — | King Ranch Borregos G-4-52659 | Borregos (Zone R-19) | Exxon Corp. | Plugged | — |
| — | King Ranch Borregos G-4-62423 | Borregos (Zone J-19) | Exxon Corp. | Plugged | — |
| — | Borregos K. R. & Seeligson O-4-6544 | Borregos (Combined Zones) | EOG Resources Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,660 | 5,686 | Perforated |
| 5,734 | 5,741 | Perforated |
| 5,904 | 5,910 | Perforated |
| 5,916 | 5,936 | Perforated |
| 6,151 | 6,244 | Perforated |
| 6,151 | 6,495 | Perforated |
| 6,286 | 6,304 | Perforated |
| 6,372 | 6,384 | Perforated |
| 6,396 | 6,405 | Perforated |
| 6,468 | 6,495 | Perforated |
| 6,470 | 6,493 | Perforated |
| 6,690 | 6,714 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,539 | — | — |
| 9.625 | 1,549 | 12.25 | 370 S |
| 9.625 | 1,550 | 12.25 | 370 S |
| 2.875 | 7,346 | — | — |
| — | 7,346 | — | — |
| 2.875 | 7,350 | — | — |
| — | 7,350 | — | — |
| 2.875 | 7,354 | 8.75 | 610 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 3, 2000 | Dec 23, 1999 | — |
| 00 | Nov 14, 1996 | Oct 24, 1996 | — |
| 00 | Aug 16, 1996 | Jun 20, 1996 | — |
| 00 | Apr 10, 1996 | Feb 20, 1996 | — |
| 00 | Jan 22, 1991 | Oct 26, 1990 | — |
| 00 | Jan 18, 1991 | — | — |
| 00 | Jun 5, 1986 | May 14, 1986 | Yes |
| 00 | Jan 12, 1984 | Aug 30, 1983 | — |
| 00 | Jan 12, 1984 | Feb 25, 1972 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-00107 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-00107 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27300107, documented in the API reference.