TEXAS · WELLS · KLEBERG COUNTY · API 42-273-00120 · DISTRICT 04
King Ranch Borregos #318
Kleberg County · Zone 21-B Trend field · Vertical
King Ranch Borregos #318 (API 42-273-00120) is a plugged well in Kleberg County, plugged August 16, 2021, last operated by Eog Resources Inc..
The RRC has issued 3 drilling permits between 1984 and 1996, permitted to 7,200 ft.
It was permitted by Exxon Corp. and has since transferred to Eog Resources Inc. on the wellbore schedule.
Its 5 leases have reported 551K barrels of oil and 4.14M mcf of gas since January 1993, last reporting volume in February 2024. The leases carry 200 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 2, 2025
- Permits on file
- 16,354
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Feb 2024 |
| Latest permit | Exxon Corp.Sep 9, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,200
- total depth, ft
- 3
- permits on file
- Sep 9, 1996
- last permit issued
- Nov 13, 1996
- completed
- 551K
- cumulative oil, bbl
- 4.14M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 13, 1996
- Shut in
- —
- Plugged
- Aug 16, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 200 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Borregos, K. R. & Seeligson O-4-6544 | Borregos (Combined Zones) | EOG Resources, Inc. | 197 | 550K | 3.47M | Jan 1993 – Feb 2024 |
| King Ranch Borregos G-4-160777 | Zone 21-B Trend | EOG Resources, Inc. | 1 | 0 | 60.5K | Nov 1996 – Nov 2016 |
| King Ranch Borregos G-4-70024 | Borregos (Consolidated Gas) | EOG Resources, Inc. | 1 | 706 | 614K | Jan 1993 – Mar 2002 |
| — G-4-50347 | — | — | 0 | 0 | 0 | — |
| King Ranch Borregos G-4-113024 | Borregos (Zone R-13) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – — |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Mar 2004
- 3EOG Resources, Inc.Feb 2013 → Feb 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 452383-99 | Recompletion | Exxon Corp. | Sep 9, 1996 | Sep 9, 1996 | Nov 11, 1996 | 6,723 |
| 397232-99 | Recompletion | Exxon Corp. | Mar 5, 1992 | Mar 6, 1992 | — | 7,200 |
| 242626-99 | Recompletion | Exxon Corp. | Jun 18, 1984 | Jun 20, 1984 | — | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 13, 1996 | King Ranch Borregos G-4-160777 | Zone 21-B Trend | EOG Resources Inc. | Plugged | — |
| Aug 20, 1984 | King Ranch Borregos G-4-113024 | Borregos (Zone R-13) | Exxon Corp. | Plugged | — |
| Aug 20, 1984 | King Ranch Borregos G-4-70024 | Borregos (Consolidated Gas) | EOG Resources Inc. | Plugged | — |
| Jul 15, 1971 | King Ranch Borregos G-4-50347 | Borregos (Zone S- 7) | Exxon Corp. | Plugged | — |
| — | Borregos K. R. G-4-53232 | Borregos (Zone R-9) | Exxon Corp. | Plugged | — |
| — | Borregos K. R. & Seeligson O-4-6544 | Borregos (Combined Zones) | EOG Resources Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,231 | 6,256 | Perforated |
| 6,653 | 6,673 | Perforated |
| 6,663 | 6,673 | Perforated |
| 6,751 | 6,761 | Perforated |
| 6,889 | 6,908 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,518 | — | — |
| 10.75 | 1,528 | 15 | 700 S |
| 2.875 | 4,637 | — | — |
| 2.875 | 7,177 | 9.875 | 910 S |
| 2.875 | 7,177 | — | — |
| 2.875 | 7,199 | 9.875 | — |
| 2.875 | 7,199 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 1997 | Dec 5, 1996 | — |
| 00 | Feb 6, 1997 | Dec 18, 1996 | — |
| 00 | Jan 9, 1997 | Dec 5, 1996 | — |
| 00 | Dec 10, 1996 | — | Yes |
| 00 | Mar 4, 1996 | Jan 16, 1996 | — |
| 00 | Nov 13, 1984 | Oct 3, 1984 | — |
| 00 | Oct 23, 1984 | Aug 25, 1984 | — |
| 00 | Jan 12, 1984 | Feb 24, 1977 | — |
| 00 | Jan 12, 1984 | Aug 25, 1972 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-00120 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-00120 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000111779 | UIC Permit | Plugged Nov 17, 2021 | 0 | 0 | 6,889–6,899 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27300120, documented in the API reference.