TEXAS · WELLS · KLEBERG COUNTY · API 42-273-01240 · DISTRICT 04
King Ranch Canelo #15
Kleberg County · Canelo (C-75) field · Vertical
King Ranch Canelo #15 (API 42-273-01240) is a plugged well in Kleberg County, plugged August 21, 1991, last operated by Exxon Corp..
The RRC has issued 4 drilling permits between 1980 and 1985, permitted to 8,700 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.Sep 26, 1985 |
- 8,700
- total depth, ft
- 4
- permits on file
- Sep 26, 1985
- last permit issued
- Oct 30, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 30, 1985
- Shut in
- —
- Plugged
- Aug 21, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-4-102754 | — | — | 0 | 0 | 0 | — |
| — G-4-114501 | — | — | 0 | 0 | 0 | — |
| — O-4-9641 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Wells named King Ranch Canelo
Exxon Corp.'s other wells filed under this lease name in Kleberg County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Operator on the lease's P-4
Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.
| Operator | From | To |
|---|---|---|
| Exxon Corp. | Aug 1, 1982 | today |
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 286163-99 | Recompletion | Exxon Corp. | Sep 25, 1985 | Sep 26, 1985 | — | 8,700 |
| 245416-99 | Recompletion | Exxon Corp. | Jul 16, 1984 | Jul 19, 1984 | — | 8,700 |
| 134129-99 | Recompletion | Exxon Corp. | Sep 23, 1981 | Sep 23, 1981 | — | 8,690 |
| 98264-99 | Other | Exxon Corp. | Nov 6, 1980 | Nov 6, 1980 | — | 8,690 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 30, 1985 | King Ranch Canelo G-4-102754 | Canelo (C-75) | Exxon Corp. | Plugged | — |
| Oct 30, 1985 | King Ranch Canelo G-4-102754 | Canelo (C-75) | Exxon Corp. | Plugged | — |
| Sep 4, 1984 | King Ranch Canelo G-4-114501 | Canelo (I-26) | Exxon Corp. | Plugged | — |
| Dec 11, 1980 | King Ranch Canelo O-4-9641 | Wildcat | Exxon Corp. | Plugged | — |
| — | King Ranch Canelo G-4-36346 | Canelo (I-34) | Exxon Corp. | Plugged | — |
| — | King Ranch Canelo O-4-5992 | Canelo (G-51) | Exxon Corp. | Plugged | — |
| — | King Ranch Canelo O-4-5992 | Canelo (G-51) | Exxon Corp. | Plugged | — |
| — | King Ranch Canelo G-4-34092 | Canelo (C-92) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,882 | 2,891 | Perforated |
| 3,776 | 3,784 | Perforated |
| 3,870 | 3,878 | Perforated |
| 8,312 | 8,316 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,549 | — | — |
| 13.375 | 1,562 | 15 | 700 S |
| 10.75 | 1,562 | 15 | 700 S |
| 2.875 | 6,798 | — | — |
| 2.875 | 6,799 | — | — |
| 2.875 | 6,814 | — | — |
| 2.875 | 6,828 | 9.875 | 1,820 S |
| 2.875 | 8,677 | — | — |
| 2.875 | 8,681 | — | — |
| 2.875 | 8,691 | — | — |
| 2.875 | 8,695 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 16, 1987 | Jan 29, 1987 | Yes |
| 00 | Mar 6, 1985 | Jan 9, 1985 | — |
| 00 | Jan 29, 1985 | Dec 17, 1984 | — |
| 00 | Jan 12, 1984 | Aug 31, 1982 | — |
| 00 | Jan 12, 1984 | Feb 26, 1981 | — |
| 00 | Jan 12, 1984 | Aug 8, 1974 | — |
| 00 | Jan 12, 1984 | Jun 30, 1964 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-01240 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-01240 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.