TEXAS · WELLS · KLEBERG COUNTY · API 42-273-01322 · DISTRICT 04

King Ranch Borregos #158

Plugged

Kleberg County · Borregos (Zone J- 3) field  · Vertical

King Ranch Borregos #158 (API 42-273-01322) is a plugged well in Kleberg County, plugged September 18, 1995, last operated by Exxon Corp..

The RRC has issued 6 drilling permits between 1980 and 1989, permitted to 7,048 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsnone
Latest permitExxon Corp.Oct 6, 1989
7,048
total depth, ft
6
permits on file
Oct 6, 1989
last permit issued
Jul 31, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 31, 1984
Shut in
—
Plugged
Sep 18, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Borregos G-4-50296Borregos (Zone J-15)Exxon Corp.100Jan 1993 – —
King Ranch Borregos G-4-113602Borregos (Zone J- 3)Exxon Corp.100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
364608-99RecompletionExxon Corp.Oct 2, 1989Oct 6, 1989—7,048
336361-99RecompletionExxon Corp.Sep 23, 1987Sep 24, 1987—7,048
256105-99RecompletionExxon Corp.Oct 26, 1984Oct 29, 1984—7,048
213104-99RecompletionExxon Corp.Sep 15, 1983Sep 20, 1983—7,048
134192-99RecompletionExxon Corp.Sep 23, 1981Sep 23, 1981—7,040
102183-99OtherExxon Corp.Dec 15, 1980Dec 15, 1980—7,040

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 31, 1984King Ranch Borregos G-4-113602Borregos (Zone J- 3)Exxon Corp.Plugged—
Nov 12, 1981King Ranch Borregos G-4-98491Borregos (Zone P-6 E.)Exxon Corp.Plugged—
Feb 4, 1971King Ranch Borregos G-4-50296Borregos (Zone J-15)Exxon Corp.Plugged—
Oct 1, 1960— G-4-9491Borregos (Zone L-9 & 11)Humble Oil & Refining Co.Plugged—
—King Ranch Borregos G-4-9509Zone 21-B TrendExxon Corp.Plugged—
—King Ranch Borregos G-4-63807Borregos (Zone L-9 & 11)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,4665,484Perforated
5,9986,029Perforated
6,5246,532Perforated
6,8186,874Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62599——
9.62510012.25565 S
8.6251,56912.25525 S
8.6251,569——
2.8757,0387.875475 S
2.8757,038——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 28, 1985Oct 30, 1984—
00Dec 6, 1984Oct 10, 1984—
00Jan 12, 1984Feb 5, 1982—
00Jan 12, 1984Oct 23, 1975—
00Jan 12, 1984May 11, 1971—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111829UIC PermitPlugged Sep 18, 1995006,818–6,874

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27301322, documented in the API reference.