TEXAS · WELLS · KLEBERG COUNTY · API 42-273-01379 · DISTRICT 04
Seeligson Unit #4349A
Kleberg County · Seeligson (Combined Zones) field · Vertical
Seeligson Unit #4349A (API 42-273-01379) is a plugged well in Kleberg County, plugged February 5, 2024, last operated by Sue-Ann Operating L.C..
The RRC has issued one drilling permit (amended once), issued January 11, 1991, permitted to 7,197 ft.
It was permitted by Oryx Energy Company and has since transferred to Sue-Ann Operating L.C. on the wellbore schedule.
Operator of record
Permitted by Oryx Energy Company; the EWA schedule now lists a different operator.
- Based in
- Victoria, TX
- P-5 status
- Active (A)
- P-5 last filed
- May 8, 2026
- Permits on file
- 380
- Phone
- (361) 576-6090
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sue-Ann Operating L.C. |
| Production reports | none |
| Latest permit | Oryx Energy CompanyJan 11, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,197
- total depth, ft
- 2
- permits on file
- Jan 11, 1991
- last permit issued
- Apr 1, 1996
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 1, 1996
- Shut in
- —
- Plugged
- Feb 5, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Seeligson Unit G-4-65339 | Seeligson (Zone 16-C) | Sue-Ann Operating, L.C. | 1 | 0 | 0 | Jan 1993 – Jan 2024 |
| King Ranch Seeligson G-4-53031 | Seeligson (Zone 21-C-3) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – Mar 1996 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 383349-98 | Recompletion | Oryx Energy Company | May 8, 1992 | Jan 11, 1991 | — | 7,197 |
| 383349-99 | Recompletion | Oryx Energy Company | Jan 11, 1991 | Jan 11, 1991 | — | 7,197 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 1, 1996 | Seeligson Unit G-4-65339 | Seeligson (Combined Zones) | Sue-Ann Operating L.C. | Plugged | — |
| Feb 16, 1972 | King Ranch Seeligson G-4-53031 | Seeligson (Consolidated) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,512 | 5,551 | Perforated |
| 6,140 | 6,152 | Perforated |
| 7,008 | 7,032 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | — | — | — |
| 5.5 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 18, 1997 | Nov 12, 1996 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-01379 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-01379 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27301379, documented in the API reference.