TEXAS · WELLS · KLEBERG COUNTY · API 42-273-01541 · DISTRICT 04

Seelingson Unit #4311

Plugged

Kleberg County · Seeligson (Zone 14-B) field  · Vertical

Seelingson Unit #4311 (API 42-273-01541) is a plugged well in Kleberg County, plugged October 13, 1993, last operated by Oryx Energy Company.

The RRC has issued one drilling permit, issued September 11, 1986, permitted to 5,990 ft.

It was permitted by Sun Expl. & Prod. CO.-Corpus and has since transferred to Oryx Energy Company on the wellbore schedule.

Its 2 leases have reported 1.3M barrels of oil and 6.67M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 201 wells, so these are lease totals, not this well alone.

Operator of record

Oryx Energy Company

Permitted by Sun Expl. & Prod. Co.-Corpus; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 27, 1998
Permits on file
1,627
Phone
(972) 715-4000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOryx Energy Company
Production reportsSue-Ann Operating, L.C.through Apr 2026
Latest permitSun Expl. & Prod. Co.-CorpusSep 11, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,990
total depth, ft
1
permits on file
Sep 11, 1986
last permit issued
Jan 5, 1943
completed
1.3M
cumulative oil, bbl
6.67M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 5, 1943
Shut in
—
Plugged
Oct 13, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 201 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Seeligson Unit O-4-6280Seeligson (Combined Zones)Sue-Ann Operating, L.C.2001.3M6.67MJan 1993 – Apr 2026
Seelingson Unit G-4-67770Seeligson (Zone 14-B)Oryx Energy Company100Jan 1993 – —

Oil, barrels lease total

Last 12 months 10,805 · prior 12 10,768(+0%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 20,259 · prior 12 24,754(-18%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oryx Energy CompanyJan 1993 → Apr 1995
  2. 2Triad Energy CorporationMay 1995 → Oct 2011
  3. 3Jetta Operating Company, Inc.Nov 2011 → Aug 2020
  4. 4Sue-Ann Operating, L.C.Sep 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
320394-99RecompletionSun Expl. & Prod. Co.-CorpusSep 11, 1986Sep 11, 1986—5,990

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 5, 1943Seelingson Unit G-4-67770Seeligson (Zone 14-B)Oryx Energy CompanyPlugged—
—Seeligson Unit O-4-6280Seeligson (Combined Zones)Sue-Ann Operating L.C.Plugged—
—Seeligson Unit O-4-6280Seeligson (Combined Zones)Sue-Ann Operating L.C.Plugged—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27301541, documented in the API reference.