TEXAS · WELLS · KLEBERG COUNTY · KING RANCH SEELIGSON LEASE · API 42-273-01580 · DISTRICT 04
King Ranch Seeligson #C-126
Kleberg County · Seeligson (Consolidated) field · Vertical
King Ranch Seeligson #C-126 (API 42-273-01580) is a plugged well in Kleberg County, plugged October 26, 2011, last operated by Exxon Mobil Corporation.
The RRC has issued one drilling permit, issued August 12, 1977, permitted to 7,200 ft.
It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.
Its lease has reported 67 barrels of oil and 152K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 15, 2026
- Permits on file
- 1,223
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | Exxon Mobil Corporationthrough Sep 2004 |
| Latest permit | Exxon Corp.Aug 12, 1977 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,200
- total depth, ft
- 1
- permits on file
- Aug 12, 1977
- last permit issued
- Sep 22, 1977
- completed
- 67
- cumulative oil, bbl
- 152K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1995 THROUGH Sep 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 22, 1977
- Shut in
- —
- Plugged
- Oct 26, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Seeligson G-4-79231 | Seeligson (Consolidated) | Exxon Mobil Corporation | 1 | 67 | 152K | Jan 1993 – Sep 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Apr 1995 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Sep 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 5288-99 | Other | Exxon Corp. | Aug 12, 1977 | Aug 12, 1977 | — | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 22, 1977 | King Ranch Seeligson G-4-79231 | Seeligson (Consolidated) | Exxon Mobil Corporation | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,901 | 6,905 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 6,500 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Nov 13, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-01580 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-01580 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27301580, documented in the API reference.