WELL · 42-273-01735 · DISTRICT 4

King Ranch Stratton #A 27

Plugged

Kleberg County · Stratton (Wardner West C.) field  · Vertical

King Ranch Stratton #A 27 (API 42-273-01735) is a plugged well in Kleberg County, plugged September 3, 1991, last operated by Exxon Mobil Corporation.

The RRC has issued one drilling permit, issued June 13, 1989, permitted to 8,617 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Its 2 leases have reported 17.1K barrels of oil and 46.4K mcf of gas since January 1993, last reporting in April 2006. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Mobil Corporationthrough Mar 2006
Latest permitExxon Corp.Jun 13, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,617
total depth, ft
1
permits on file
Jun 13, 1989
last permit issued
Feb 13, 1971
completed
17.1K
cumulative oil, bbl
46.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 13, 1971
Shut in
—
Plugged
Sep 3, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Stratton O-4-7820Stratton (Wardner West, C.)Exxon Mobil Corporation517.1K46.4KJan 1993 – Apr 2006
— G-4-133173——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Nov 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
360287-99RecompletionExxon Corp.Jun 12, 1989Jun 13, 1989—8,617

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-133173————
—— O-4-7820————

Perforations

Perforated and open-hole intervals.

FromToType
5,0355,039Perforated
5,0465,049Perforated
6,3206,330Perforated
6,3306,356Perforated
—5,952Perforated
—6,323Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,024——
10.752,03915930 S
10.752,039——
2.8756,832——
2.8756,846——
—6,846——
2.8756,8509.875720 S
2.8756,850——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 20, 1991Aug 30, 1990—
00Mar 26, 1990Jan 17, 1990Yes
00Feb 2, 1990——
00Oct 11, 1989Sep 13, 1989Yes
00Jan 12, 1984Dec 5, 1975—
00Jan 12, 1984Mar 15, 1971—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

129K
bbl, last 12 reported months
535K
bbl, all reported
Feb 1985
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000004643UIC PermitPlugged Oct 7, 19912,5002,0006,316–6,356

MONTHLY INJECTED, BBL · H-10 · LAST 16 REPORTED MONTHS

Last 12 months 129,487 · prior 12 405,160(-68%)

020K40K60K19841985

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27301735, documented in the API reference.