TEXAS · WELLS · KLEBERG COUNTY · API 42-273-01831 · DISTRICT 04
King Ranch-Canelo #22
Kleberg County · Canelo (H-26 Sd.) field · Vertical
King Ranch-Canelo #22 (API 42-273-01831) is a plugged well in Kleberg County, plugged August 12, 1991, last operated by Exxon Corp..
The RRC has issued 4 drilling permits between 1981 and 1990, permitted to 8,000 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Exxon Corp.Jun 15, 1990 |
- 8,000
- total depth, ft
- 4
- permits on file
- Jun 15, 1990
- last permit issued
- Nov 7, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 7, 1985
- Shut in
- —
- Plugged
- Aug 12, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-4-97163 | — | — | 0 | 0 | 0 | — |
| — O-4-5929 | — | — | 0 | 0 | 0 | — |
| — O-4-6436 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 374461-99 | Recompletion | Exxon Corp. | Jun 13, 1990 | Jun 15, 1990 | — | 7,409 |
| 283056-99 | Recompletion | Exxon Corp. | Aug 9, 1985 | Aug 22, 1985 | — | 7,409 |
| 271217-99 | Recompletion | Exxon Corp. | Mar 28, 1985 | Apr 2, 1985 | — | 8,000 |
| 125300-99 | Recompletion | Exxon Corp. | Jul 15, 1981 | Jul 15, 1981 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 7, 1985 | King Ranch-Canelo O-4-5929 | Canelo (H-26 Sd.) | Exxon Corp. | Plugged | — |
| May 2, 1985 | King Ranch Canelo G-4-97163 | Canelo (B-92) | Exxon Corp. | Plugged | — |
| May 2, 1985 | King Ranch Canelo G-4-97163 | Canelo (B-92) | Exxon Corp. | Plugged | — |
| — | King Ranch Canelo O-4-6436 | Canelo (H-30 U) | Exxon Corp. | Plugged | — |
| — | King Ranch Canelo O-4-6436 | Canelo (H-30 U) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,830 | 2,836 | Perforated |
| 2,921 | 2,931 | Perforated |
| 7,200 | 7,208 | Perforated |
| — | 7,243 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,540 | 12.25 | 485 S |
| 2.875 | 7,372 | 7.875 | 970 S |
| 2.875 | 7,394 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 17, 1986 | Jan 7, 1986 | Yes |
| 00 | Jan 14, 1986 | — | — |
| 00 | Jul 9, 1985 | Jun 28, 1985 | Yes |
| 00 | Jan 12, 1984 | Dec 29, 1981 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-01831 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-01831 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27301831, documented in the API reference.