WELL · 42-273-30265 · DISTRICT 4

King Ranch Stratton #A-71

Plugged

Kleberg County · Stratton (Consolidated) field  · Vertical

King Ranch Stratton #A-71 (API 42-273-30265) is a plugged well in Kleberg County, plugged November 13, 1997, last operated by Eog Resources Inc..

The RRC has issued 2 drilling permits between 1977 and 1978, permitted to 7,100 ft.

It was permitted by Exxon Corp. and has since transferred to Eog Resources Inc. on the wellbore schedule.

Its 3 leases have reported 22.6K barrels of oil and 115K mcf of gas since January 1993, last reporting in May 2025. The leases carry 20 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,348
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsEOG Resources, Inc.through May 2019
Latest permitExxon Corp.Jul 3, 1978
7,100
total depth, ft
2
permits on file
Jul 3, 1978
last permit issued
Apr 10, 1997
completed
22.6K
cumulative oil, bbl
115K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 10, 1997
Shut in
—
Plugged
Nov 13, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Stratton O-4-12617Stratton (Consolidated)EOG Resources, Inc.1322K98.5KNov 1996 – May 2025
King Ranch Stratton G-4-78654Stratton (Consolidated)Exxon Corp.1015.7KJan 1993 – Nov 1997
King Ranch Stratton O-4-7657Stratton (Wardner West)Exxon Corp.6617876Jan 1993 – Nov 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Aug 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Sep 2003
  3. 3EOG Resources, Inc.Jul 2016 → May 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
27806-99OtherExxon Corp.Jul 3, 1978Jul 3, 1978—7,100
11206-99OtherExxon Corp.Nov 1, 1977Nov 1, 1977—7,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 10, 1997King Ranch Stratton O-4-12617Stratton (Consolidated)EOG Resources Inc.Plugged—
Aug 6, 1978King Ranch Stratton G-4-78654Stratton (Consolidated)Exxon Corp.Plugged—
—King Ranch Stratton G-4-75063Stratton (5470)Exxon Corp.Plugged—
—King Ranch Stratton O-4-7657Stratton (Wardner West)Exxon Corp.Plugged—
—King Ranch Stratton G-4-68444Stratton (Bertram B)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,3985,405Perforated
5,4455,450Perforated
5,4805,484Perforated
5,5455,555Perforated
6,1186,135Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,55611370 S
2.8757,0717.875585 S
2.8757,071——
2.8757,0757.875585 S
2.8757,075——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 1997May 6, 1997—
00Nov 8, 1996——
00Jun 14, 1991Aug 30, 1990—
00Jan 12, 1984Oct 3, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27330265, documented in the API reference.