TEXAS · WELLS · KLEBERG COUNTY · API 42-273-31168 · DISTRICT 04
King Ranch Seeligson #4392A
Kleberg County · Seeligson (Consolidated) field · Vertical
King Ranch Seeligson #4392A (API 42-273-31168) is a plugged well in Kleberg County, plugged February 22, 2024, last operated by Triad Energy Corporation.
The RRC has issued 3 drilling permits between 1977 and 1989, permitted to 7,350 ft.
It was permitted by Sun Exploration & Production CO. and has since transferred to Triad Energy Corporation on the wellbore schedule.
Operator of record
Permitted by Sun Exploration & Production Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 10, 2010
- Permits on file
- 138
- Phone
- (713) 337-1454
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Triad Energy Corporation |
| Production reports | none |
| Latest permit | Sun Exploration & Production Co.Mar 13, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,350
- total depth, ft
- 3
- permits on file
- Mar 13, 1989
- last permit issued
- Oct 9, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 9, 1981
- Shut in
- —
- Plugged
- Feb 22, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Seeligson G-4-76375 | Seeligson (Zone 21-G-07) | Sue-Ann Operating, L.C. | 1 | 0 | 0 | Jan 1993 – Feb 2024 |
| King Ranch Seeligson G-4-98757 | Seeligson (Zone 20-G-02, N) | Triad Energy Corporation | 1 | 0 | 0 | Jan 1993 – Mar 2006 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 356849-99 | Recompletion | Sun Exploration & Production Co. | Mar 9, 1989 | Mar 13, 1989 | — | 6,950 |
| 133793-99 | Recompletion | Exxon Corp. | Sep 21, 1981 | Sep 21, 1981 | — | 7,350 |
| 3437-99 | Drill | Exxon Corp. | Jul 20, 1977 | Jul 20, 1977 | Aug 2, 1977 | 7,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 9, 1981 | King Ranch Seeligson G-4-98757 | Seeligson (Consolidated) | Triad Energy Corporation | Plugged | — |
| Aug 19, 1977 | King Ranch Seeligson G-4-76375 | Seeligson (Consolidated) | Sue-Ann Operating L.C. | Plugged | — |
| — | King Ranch Seeligson G-4-76374 | Seeligson (Zone 21-F) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,228 | 6,232 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,056 | 12.25 | 815 S |
| 2.875 | 6,936 | 7.875 | 690 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 7, 1982 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-31168 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-31168 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27331168, documented in the API reference.