TEXAS · WELLS · KLEBERG COUNTY · API 42-273-31272 · DISTRICT 04

Yeary #1

Plugged

Kleberg County · Yeary (Knox) field  · Vertical

Yeary #1 (API 42-273-31272) is a plugged well in Kleberg County, plugged August 2, 1983, last operated by Txo Production Corp..

The RRC has issued 2 drilling permits between 1978 and 1982, permitted to 9,200 ft.

Operator of record

TXO Production Corp.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
3,227
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsnone
Latest permitTXO Production Corp.Jun 25, 1982
9,200
total depth, ft
2
permits on file
Jun 25, 1982
last permit issued
Jun 27, 1982
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 27, 1982
Shut in
—
Plugged
Aug 2, 1983

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
164720-99RecompletionTXO Production Corp.Jun 25, 1982Jun 25, 1982—9,200
23695-99DrillTexas Oil & Gas Corp.May 8, 1978May 8, 1978May 12, 19789,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 27, 1982Yeary O-4-10137Yeary (Knox)TXO Production Corp.Plugged—
—Yeary Gas Unit G-4-78736Yeary (Walsh)TXO Production Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,4888,493Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,57012.25650 S
2.8758,9997.8751,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 2, 1982—
00Jan 12, 1984Oct 4, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.