TEXAS · WELLS · KLEBERG COUNTY · KING RANCH SEELIGSON LEASE · API 42-273-31401 · DISTRICT 04

King Ranch Seeligson #E107

Plugged

Kleberg County · T-C-B E (20-I-4 NE) field  · Vertical

King Ranch Seeligson #E107 (API 42-273-31401) is a plugged well in Kleberg County, plugged March 10, 1993, last operated by Exxon Mobil Corporation.

The RRC has issued one drilling permit, issued September 11, 1979, permitted to 8,050 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Its lease has reported 14.3K barrels of oil and 43.1K mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Mobil Corporationthrough Aug 1999
Latest permitExxon Corp.Sep 11, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,050
total depth, ft
1
permits on file
Sep 11, 1979
last permit issued
Oct 14, 1979
completed
14.3K
cumulative oil, bbl
43.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 14, 1979
Shut in
—
Plugged
Mar 10, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Seeligson O-4-9388T-C-B, E (20-I-4, NE)Exxon Mobil Corporation814.3K43.1KJan 1993 – Aug 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Aug 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
57656-99DrillExxon Corp.Sep 11, 1979Sep 11, 1979Sep 27, 19798,050

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 14, 1979King Ranch Seeligson O-4-9388T-C-B E (20-I-4 NE)Exxon Mobil CorporationPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
7,5157,519Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52712.25685 S
2.8757,6477.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Oct 23, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 1993
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000056707H-1 InjectionPlugged Apr 8, 199301,5007,510–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119921993

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27331401, documented in the API reference.