TEXAS · WELLS · KLEBERG COUNTY · KING RANCH SEELIGSON LEASE · API 42-273-31534 · DISTRICT 04

King Ranch Seeligson #E110

Plugged

Kleberg County · T-C-B E. (20-I-4 NE 2 Seg.) field  · Vertical

King Ranch Seeligson #E110 (API 42-273-31534) is a plugged well in Kleberg County, plugged March 8, 1993, last operated by Eog Resources Inc..

The RRC has issued 3 drilling permits between 1980 and 1989, permitted to 7,890 ft.

It was permitted by Exxon Corp. and has since transferred to Eog Resources Inc. on the wellbore schedule.

Its lease has reported 292K barrels of oil and 334K mcf of gas since January 1993, last reporting in May 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,348
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsExxon Mobil Corporationthrough Apr 2002
Latest permitExxon Corp.Mar 31, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,890
total depth, ft
3
permits on file
Mar 31, 1989
last permit issued
Jul 19, 1989
completed
292K
cumulative oil, bbl
334K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 19, 1989
Shut in
—
Plugged
Mar 8, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Seeligson O-4-11545T-C-B, E. (20-I-4, NE, 2 Seg.)EOG Resources, Inc.4292K334KJan 1993 – May 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Apr 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
357579-99RecompletionExxon Corp.Mar 30, 1989Mar 31, 1989—7,490
350981-99RecompletionExxon Corp.Sep 8, 1988Sep 13, 1988—7,890
101942-99DrillExxon Corp.Dec 12, 1980Dec 12, 1980Jan 4, 19817,890

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 19, 1989King Ranch Seeligson O-4-11545T-C-B E. (20-I-4 NE 2 Seg.)EOG Resources Inc.Plugged—
Oct 20, 1988King Ranch Seeligson G-4-94222T-C-B East (20-I-2 NW)Exxon Corp.Plugged—
Oct 20, 1988King Ranch Seeligson G-4-94222T-C-B East (20-I-2 NW)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
7,3547,358Perforated
7,4497,459Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52512.25620 S
2.8757,4697.875245 S
2.8757,4707.875245 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 15, 1989Aug 4, 1989—
00Aug 31, 1989——
00Jan 9, 1989Nov 18, 1988—
00Jan 12, 1984May 1, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
21.5K
bbl, all reported
Feb 1993
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000070992H-1 InjectionPlugged Mar 24, 19931,5003,7007,449–7,459

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 21,483(-100%)

02K4K6K19921993

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27331534, documented in the API reference.