TEXAS · WELLS · KLEBERG COUNTY · G-4-115083 LEASE · API 42-273-31722 · DISTRICT 04
King Ranch Borregos #588
Kleberg County · Borregos (Zone N-21) field · Vertical
King Ranch Borregos #588 (API 42-273-31722) is a plugged well in Kleberg County, plugged May 27, 1992, last operated by Exxon Corp..
The RRC has issued 5 drilling permits between 1982 and 1988, permitted to 8,900 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.May 13, 1988 |
- 8,900
- total depth, ft
- 5
- permits on file
- May 13, 1988
- last permit issued
- Feb 22, 1988
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 22, 1988
- Shut in
- —
- Plugged
- May 27, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-4-115083 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 346033-99 | Recompletion | Exxon Corp. | May 3, 1988 | May 13, 1988 | — | 8,500 |
| 341738-99 | Recompletion | Exxon Corp. | Jan 21, 1988 | Jan 22, 1988 | — | 8,500 |
| 277841-99 | Recompletion | Exxon Corp. | Jun 14, 1985 | Jun 17, 1985 | — | 8,500 |
| 251542-99 | Recompletion | Exxon Corp. | Sep 10, 1984 | Sep 17, 1984 | — | 8,500 |
| 169355-99 | Drill | Exxon Corp. | Aug 16, 1982 | Aug 16, 1982 | Oct 5, 1982 | 8,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 22, 1988 | King Ranch Borregos G-4-115083 | Borregos (Zone N-21) | Exxon Corp. | Plugged | — |
| Feb 22, 1988 | King Ranch Borregos G-4-115083 | Borregos (Zone N-21) | Exxon Corp. | Plugged | — |
| Feb 22, 1988 | King Ranch Borregos G-4-115083 | Borregos (Zone N-21) | Exxon Corp. | Plugged | — |
| Dec 1, 1982 | King Ranch Borregos G-4-104936 | Borregos (Zone V-19 NW.) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,123 | 6,132 | Perforated |
| 6,342 | 6,351 | Perforated |
| 6,375 | 6,382 | Perforated |
| 8,316 | 8,323 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,534 | 14.75 | 925 S |
| 10.375 | 1,534 | 14.75 | 925 S |
| 7.625 | 7,267 | 9.875 | 665 S |
| 2.875 | 7,401 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 5, 1988 | Mar 16, 1988 | Yes |
| 00 | Jul 3, 1986 | Jun 19, 1986 | Yes |
| 00 | Mar 8, 1985 | Feb 4, 1985 | — |
| 00 | Mar 7, 1985 | Jan 10, 1985 | — |
| 00 | Jan 12, 1984 | Mar 8, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-31722 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-31722 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27331722, documented in the API reference.