TEXAS · WELLS · KLEBERG COUNTY · API 42-273-31788 · DISTRICT 04
King Ranch Borregos #590
Kleberg County · Borregos (Consolidated Gas) field · Vertical
King Ranch Borregos #590 (API 42-273-31788) is a plugged well in Kleberg County, plugged October 25, 2021, last operated by Eog Resources Inc..
The RRC has issued 4 drilling permits (amended once) between 1983 and 1997, permitted to 7,406 ft.
It was permitted by Exxon Corp. and has since transferred to Eog Resources Inc. on the wellbore schedule.
Its 2 leases have reported 1.16K barrels of oil and 146K mcf of gas since the record begins in January 1993, with no volume in the three years through August 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Aug 12, 2026
- Permits on file
- 16,354
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Apr 2000 |
| Latest permit | Exxon Corp.Feb 24, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,406
- total depth, ft
- 5
- permits on file
- Feb 24, 1997
- last permit issued
- Jul 24, 1997
- completed
- 1.16K
- cumulative oil, bbl
- 146K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH APR 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 24, 1997
- Shut in
- —
- Plugged
- Oct 25, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Borregos G-4-127868 | Borregos (Consolidated Gas) | EOG Resources, Inc. | 1 | 1.16K | 146K | by Jan 1993 – Apr 2000 |
| King Ranch Borregos G-4-112284 | Borregos (Zone N-11) | Exxon Corp. | 1 | 0 | 0 | by Jan 1993 – — |
No volumes reported on these leases in the last three years.
Wells named King Ranch Borregos
EOG Resources Inc.'s other wells filed under this lease name in Kleberg County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Apr 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 459028-99 | Recompletion | Exxon Corp. | Feb 24, 1997 | Feb 24, 1997 | — | 6,893 |
| 331382-98 | Recompletion | Exxon Corp. | Jul 8, 1988 | Jun 11, 1987 | — | 7,406 |
| 331382-99 | Recompletion | Exxon Corp. | Jun 9, 1987 | Jun 11, 1987 | — | 7,406 |
| 301751-99 | Recompletion | Exxon Corp. | May 1, 1986 | May 2, 1986 | — | 7,406 |
| 200970-99 | Drill | Exxon Corp. | Jan 31, 1984 | Jul 11, 1983 | Sep 22, 1983 | 7,406 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 24, 1997 | King Ranch Borregos G-4-127868 | Borregos (Consolidated Gas) | EOG Resources Inc. | Plugged | — |
| Dec 21, 1983 | King Ranch Borregos G-4-112284 | Borregos (Zone N-11) | Exxon Corp. | Plugged | — |
| Dec 21, 1983 | Borregos K. R. & Seeligson O-4-6544 | Borregos (Combined Zones) | EOG Resources Inc. | Plugged | — |
| Nov 3, 1983 | King Ranch Borregos G-4-109771 | Borregos (Zone L-9 & 11) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,042 | 6,055 | Perforated |
| 6,234 | 6,244 | Perforated |
| 6,265 | 6,275 | Perforated |
| 6,424 | 6,432 | Perforated |
| 6,436 | 6,444 | Perforated |
| 6,436 | 6,448 | Perforated |
| 6,815 | 6,825 | Perforated |
| 6,832 | 6,842 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,538 | 12.25 | 695 S |
| 2.875 | 7,446 | — | — |
| 2.875 | 7,447 | 7.875 | 831 S |
| 2.875 | 7,447 | — | — |
| 2.875 | 7,448 | 7.875 | 831 S |
| 2.875 | 7,448 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 1997 | Sep 11, 1997 | — |
| 00 | Mar 28, 1997 | Jan 16, 1997 | — |
| 00 | Apr 3, 1996 | Feb 2, 1996 | — |
| 00 | Feb 6, 1990 | Jul 8, 1988 | — |
| 00 | Aug 30, 1988 | — | — |
| 00 | Nov 13, 1984 | Aug 28, 1984 | — |
| 00 | Oct 23, 1984 | Aug 10, 1984 | — |
| 00 | Apr 24, 1984 | Mar 16, 1984 | — |
| 00 | Apr 10, 1984 | Mar 16, 1984 | — |
| 00 | Mar 21, 1984 | Jan 26, 1984 | — |
| 00 | Feb 15, 1984 | Jan 26, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-31788 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-31788 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27331788, documented in the API reference.