TEXAS · WELLS · KLEBERG COUNTY · API 42-273-31817 · DISTRICT 04
King Ranch Borregos #598
Kleberg County · Borregos (Consolidated Gas) field · Producing · Vertical
King Ranch Borregos #598 (API 42-273-31817) is a well in Kleberg County operated by Eog Resources Inc., completed January 31, 2000 and listed as producing on the RRC schedule.
The RRC has issued 5 drilling permits (amended 3 times) between 1983 and 1991, permitted to 7,000 ft.
It was permitted by Exxon Corp. and has since transferred to Eog Resources Inc. on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 2, 2025
- Permits on file
- 16,354
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Apr 2026 |
| Latest permit | Exxon Corp.Feb 25, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 8
- permits on file
- Feb 25, 1991
- last permit issued
- Jan 31, 2000
- completed
- 0
- cumulative oil, bbl
- 3.55M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 31, 2000
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Borregos G-4-138973 | Borregos (Zone J-15) | EOG Resources, Inc. | 1 | 0 | 3.55M | Jan 1993 – Jul 2026 |
| King Ranch Borregos G-4-130331 | Borregos (Zone N- 4-5-6-7) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – Jan 1996 |
| — G-4-121346 | — | — | 0 | 0 | 0 | — |
Gas, mcf lease total
Last 12 months 79,810 · prior 12 88,141(-9%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Dec 2012
- 3EOG Resources, Inc.Jan 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 384948-98 | Recompletion | Exxon Corp. | Jun 12, 1991 | Feb 25, 1991 | May 15, 1991 | 7,000 |
| 384948-99 | Recompletion | Exxon Corp. | Feb 21, 1991 | Feb 25, 1991 | — | 7,000 |
| 332182-97 | Recompletion | Exxon Corp. | Mar 10, 1989 | Jun 29, 1987 | — | 7,000 |
| 332182-98 | Recompletion | Exxon Corp. | Apr 15, 1988 | Jun 29, 1987 | — | 7,000 |
| 332182-99 | Recompletion | Exxon Corp. | Jun 26, 1987 | Jun 29, 1987 | — | 7,000 |
| 298478-99 | Recompletion | Exxon Corp. | Jun 6, 1986 | Feb 24, 1986 | — | 7,000 |
| 272669-99 | Recompletion | Exxon Corp. | Apr 16, 1985 | Apr 17, 1985 | — | 7,000 |
| 218229-99 | Drill | Exxon Corp. | Feb 29, 1984 | Oct 24, 1983 | Dec 29, 1983 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 31, 2000 | King Ranch Borregos G-4-138973 | Borregos (Consolidated Gas) | EOG Resources Inc. | Producing | 7,000 |
| Feb 24, 1989 | King Ranch Borregos G-4-130331 | Borregos (Zone N- 4-5-6-7) | Exxon Corp. | Not on Schedule | — |
| May 18, 1986 | King Ranch Borregos G-4-121346 | Borregos (Zone N-21) | Exxon Corp. | Not on Schedule | — |
| Jul 4, 1985 | Borregos K. R. & Seeligson O-4-6544 | Borregos (Combined Zones) | EOG Resources Inc. | Not on Schedule | — |
| Jul 4, 1985 | Borregos K. R. & Seeligson O-4-6544 | Borregos (Combined Zones) | EOG Resources Inc. | Not on Schedule | — |
| Feb 3, 1984 | King Ranch Borregos G-4-109970 | Borregos (Zone N-23) | Exxon Corp. | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,539 | 5,548 | Perforated |
| 5,606 | 5,614 | Perforated |
| 5,658 | 5,666 | Perforated |
| 5,928 | 5,938 | Perforated |
| 6,056 | 6,065 | Perforated |
| 6,168 | 6,196 | Perforated |
| 6,204 | 6,210 | Perforated |
| 6,236 | 6,263 | Perforated |
| 6,303 | 6,321 | Perforated |
| 6,352 | 6,366 | Perforated |
| 6,404 | 6,416 | Perforated |
| 6,442 | 6,452 | Perforated |
| 6,618 | 6,628 | Perforated |
| 6,667 | 6,674 | Perforated |
| 6,772 | 6,793 | Perforated |
| 6,890 | 6,897 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,507 | 12.5 | 695 sx |
| 2.875 | 6,922 | 7.875 | 875 S |
| 2.875 | 6,992 | 7.875 | 875 S |
| 2.875 | 6,992 | — | — |
| 2.875 | 6,994 | 7.875 | 875 sx |
| 2.875 | 6,994 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 2000 | Feb 17, 2000 | — |
| 00 | Sep 16, 1996 | Aug 5, 1996 | — |
| 00 | Apr 3, 1996 | Feb 2, 1996 | — |
| 00 | Dec 30, 1991 | Jun 17, 1991 | Yes |
| 00 | Aug 21, 1991 | — | — |
| 00 | Apr 26, 1989 | Mar 31, 1989 | Yes |
| 00 | Apr 12, 1989 | — | — |
| 00 | Jun 19, 1986 | Jun 9, 1986 | Yes |
| 00 | Jun 18, 1986 | — | — |
| 00 | Dec 4, 1985 | Oct 25, 1985 | — |
| 00 | May 29, 1984 | Apr 5, 1984 | — |
| 00 | May 4, 1984 | Mar 9, 1984 | — |
| 00 | Apr 28, 1984 | Apr 5, 1984 | — |
| 00 | Apr 20, 1984 | Mar 9, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-31817 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-31817 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27331817, documented in the API reference.