TEXAS · WELLS · KLEBERG COUNTY · API 42-273-31840 · DISTRICT 04

King Ranch Borregos #600

Plugged

Kleberg County · Borregos (Consolidated Gas) field  · Vertical

King Ranch Borregos #600 (API 42-273-31840) is a plugged well in Kleberg County, plugged June 2, 2005, last operated by Exxon Mobil Corporation.

The RRC has issued 4 drilling permits between 1983 and 1994, permitted to 7,400 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Mobil Corporationthrough Aug 1999
Latest permitExxon Corp.Jan 14, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,400
total depth, ft
4
permits on file
Jan 14, 1994
last permit issued
Nov 9, 1997
completed
0
cumulative oil, bbl
176K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Aug 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 9, 1997
Shut in
—
Plugged
Jun 2, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Borregos G-4-149693Borregos (Zone J- 3)Exxon Mobil Corporation10176KJan 1994 – Jun 2005
King Ranch Borregos G-4-136629Borregos (Zone J- 9A)Exxon Corp.100Jan 1993 – Jan 1994
— G-4-112612——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Mar 1994 → Aug 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
420194-99RecompletionExxon Corp.Jan 14, 1994Jan 14, 1994Jan 21, 19945,495
373212-99RecompletionExxon Corp.May 11, 1990May 15, 1990—7,000
341462-99RecompletionExxon Corp.Jan 15, 1988Jan 18, 1988—7,000
224413-99DrillExxon Corp.Dec 21, 1983Dec 23, 1983Feb 2, 19847,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 9, 1997King Ranch Borregos G-4-149693Borregos (Consolidated Gas)Exxon Mobil CorporationPlugged—
Oct 24, 1990King Ranch Borregos G-4-136629Borregos (Zone J- 9A)Exxon Corp.Plugged—
Jul 26, 1984King Ranch Borregos G-4-112612Borregos (Zone J-16 W)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,8224,840Perforated
5,0565,076Perforated
5,3825,407Perforated
5,3825,408Perforated
5,5105,524Perforated
5,6925,696Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,51112.25745 S
2.8756,9957.875975 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 14, 1998Dec 23, 1997—
00Apr 9, 1996Feb 21, 1996—
00Jan 26, 1995May 27, 1994Yes
00Jun 28, 1994——
00Feb 20, 1991Nov 28, 1990—
00Jan 29, 1991——
00Oct 16, 1984Aug 28, 1984—
00Oct 3, 1984Aug 13, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27331840, documented in the API reference.