TEXAS · WELLS · KLEBERG COUNTY · API 42-273-31898 · DISTRICT 04

King Ranch East Laureles #B 21

Plugged

Kleberg County · Bina NE (H-35) field  · Vertical

King Ranch East Laureles #B 21 (API 42-273-31898) is a plugged well in Kleberg County, plugged December 20, 1994, last operated by Exxon Corp..

The RRC has issued 9 drilling permits (amended once) between 1984 and 1994, permitted to 8,450 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsExxon Corp.through Feb 1994
Latest permitExxon Corp.May 6, 1994
8,450
total depth, ft
10
permits on file
May 6, 1994
last permit issued
Jun 24, 1994
completed
0
cumulative oil, bbl
365K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 24, 1994
Shut in
—
Plugged
Dec 20, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch East Laureles G-4-132630Bina (B-1)Exxon Corp.10365KJan 1993 – Dec 1994
King Ranch East Laureles G-4-150642Bina, NE (H-35)Exxon Corp.100Jun 1994 – Dec 1994
King Ranch East Laureles G-4-139710Bina, N.E. (H-66)Exxon Corp.100Jan 1993 – Jun 1994
— G-4-129135——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Feb 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
423701-99RecompletionExxon Corp.May 6, 1994May 6, 1994Jun 13, 19947,665
389890-99RecompletionExxon Corp.Jul 15, 1991Jul 18, 1991Sep 11, 19918,050
365884-99RecompletionExxon Corp.Nov 1, 1989Nov 3, 1989—8,050
347451-98RecompletionExxon Corp.Nov 22, 1988Jul 5, 1988—8,050
347451-99RecompletionExxon Corp.Jun 6, 1988Jul 5, 1988—8,050
343260-99RecompletionExxon Corp.Feb 29, 1988Mar 2, 1988—8,050
326547-99RecompletionExxon Corp.Feb 13, 1987Feb 17, 1987—8,050
296272-99RecompletionExxon Corp.Jan 21, 1986Jan 28, 1986—8,450
275558-99RecompletionExxon Corp.May 10, 1985May 21, 1985—8,450
243847-99DrillExxon Corp.Nov 2, 1984Jul 3, 1984Aug 4, 19848,050

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 24, 1994King Ranch East Laureles G-4-150642Bina NE (H-35)Exxon Corp.Plugged—
Oct 8, 1991King Ranch East Laureles G-4-139710Bina N.E. (H-66)Exxon Corp.Plugged—
Oct 17, 1989King Ranch East Laureles G-4-132630Bina (B-1)Exxon Corp.Plugged—
Oct 27, 1988King Ranch East Laureles G-4-129135Bina NE. (H-76)Exxon Corp.Plugged—
Oct 26, 1988King Ranch East Laureles G-4-121112Bina N.E. (H-95)Exxon Corp.Plugged—
Oct 26, 1988King Ranch East Laureles G-4-121112Bina N.E. (H-95)Exxon Corp.Plugged—
Apr 9, 1986King Ranch East Laureles G-4-121127Bina N.E. (H-70)Exxon Corp.Plugged—
Jun 11, 1985King Ranch East Laureles G-4-117943Bina N.E. (H-73)Exxon Corp.Plugged—
Sep 5, 1984King Ranch East Laureles G-4-114133Bina N. E. (H-81)Exxon Corp.Plugged—
Aug 23, 1984King Ranch East Laureles G-4-113609Bina N. E. (H-89)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
6,8186,826Perforated
7,3447,347Perforated
7,6467,654Perforated
7,6827,688Perforated
7,7057,709Perforated
7,7367,743Perforated
7,7787,784Perforated
7,8387,846Perforated
7,8627,874Perforated
7,9427,946Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,47812.25745 S
8.6251,47912.25745 S
8.6251,74912.25745 S
2.8758,0477.875550 S
2.8758,0487.875550 S
2.8758,048——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 12, 1994Aug 11, 1994Yes
00Aug 30, 1994——
00Nov 27, 1991Oct 25, 1991Yes
00Nov 4, 1991——
00Feb 14, 1990Nov 16, 1989Yes
00Jan 16, 1990——
00Feb 13, 1989Dec 29, 1988Yes
00Feb 2, 1989Nov 22, 1988Yes
00Dec 20, 1988——
00Jun 6, 1986Apr 23, 1986Yes
00Jun 5, 1986May 16, 1986Yes
00Jun 4, 1986——
00May 30, 1986——
00Sep 25, 1985Aug 9, 1985—
00Sep 14, 1985——
00Mar 6, 1985Nov 7, 1984—
00Jan 21, 1985Nov 5, 1984—
00Jan 19, 1985Oct 25, 1984—
00Dec 5, 1984Oct 23, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27331898, documented in the API reference.