TEXAS · WELLS · KLEBERG COUNTY · API 42-273-31947 · DISTRICT 04

King Ranch East Laureles #B26

Plugged

Kleberg County · Bina N. E. (H-19) field  · Vertical

King Ranch East Laureles #B26 (API 42-273-31947) is a plugged well in Kleberg County, plugged November 8, 1995, last operated by Exxon Corp..

The RRC has issued 3 drilling permits (amended once) between 1984 and 1991, permitted to 9,080 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsExxon Corp.through Jan 1995
Latest permitExxon Corp.Jan 22, 1991
9,080
total depth, ft
4
permits on file
Jan 22, 1991
last permit issued
Mar 12, 1991
completed
0
cumulative oil, bbl
635K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 12, 1991
Shut in
—
Plugged
Nov 8, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch East Laureles G-4-132056Bina (B-1)Exxon Corp.10635KJan 1993 – Nov 1995
King Ranch East Laureles G-4-138364Bina, N. E. (H-19)Exxon Corp.100Jan 1993 – Nov 1995
— G-4-116228——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Jan 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
383636-98RecompletionExxon Corp.Apr 11, 1991Jan 22, 1991Feb 6, 19918,080
383636-99RecompletionExxon Corp.Jan 18, 1991Jan 22, 1991—8,080
360659-99RecompletionExxon Corp.Jun 21, 1989Jun 23, 1989—8,080
260115-99DrillExxon Corp.Dec 3, 1984Dec 4, 1984Jan 17, 19859,080

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 12, 1991King Ranch East Laureles G-4-138364Bina N. E. (H-19)Exxon Corp.Plugged—
Sep 4, 1989King Ranch East Laureles G-4-132056Bina (B-1)Exxon Corp.Plugged—
Feb 6, 1985King Ranch East Laureles G-4-116241Bina N.E. (H-22)Exxon Corp.Plugged—
Feb 4, 1985King Ranch East Laureles G-4-116228Bina N.E. (H-50)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
6,8386,843Perforated
7,1867,192Perforated
7,2207,225Perforated
7,5007,532Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,25012.25715 S
2.8758,0777.875910 S
2.8758,079——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 24, 1991Apr 15, 1991Yes
00Jun 18, 1991——
00Jan 30, 1990Oct 9, 1989Yes
00Nov 9, 1989——
00Jun 5, 1985Apr 23, 1985—
00May 15, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27331947, documented in the API reference.