TEXAS · WELLS · KLEBERG COUNTY · API 42-273-32192 · DISTRICT 04

King Ranch Alazan #444

Plugged

Kleberg County · Alazan North (Frio Cons.) field  · Vertical

King Ranch Alazan #444 (API 42-273-32192) is a plugged well in Kleberg County, plugged July 22, 2010, last operated by Exxon Mobil Corporation.

The RRC has issued 2 drilling permits between 1993 and 1998, permitted to 13,000 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including J-36, L-27, Deep Frio.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Corp.through Dec 1999
Latest permitExxon Corp.Oct 22, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
2
permits on file
Oct 22, 1998
last permit issued
Dec 19, 2000
completed
0
cumulative oil, bbl
593K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1993 THROUGH Jul 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 19, 2000
Shut in
—
Plugged
Jul 22, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Alazan G-4-172317Alazan, North (Frio Cons.)Exxon Mobil Corporation10121KFeb 1999 – Jul 2010
King Ranch Alazan G-4-147625Alazan, North (Deep Frio)Exxon Corp.10472KNov 1993 – Jan 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Dec 1993 → Dec 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
480303-99RecompletionExxon Corp.Oct 20, 1998Oct 22, 1998Jan 7, 199911,102
414828-99DrillExxon Corp.Aug 11, 1993Aug 11, 1993Sep 2, 199313,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 19, 2000King Ranch Alazan G-4-172317Alazan North (Frio Cons.)Exxon Mobil CorporationPlugged—
Jun 22, 1997King Ranch Alazan G-4-147625Alazan North (Deep Frio)Exxon Corp.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 45 ft elevation.Download CSV →

FormationMD ftSubsea
J-369,360-9,315
L-2710,504-10,459
Deep Frio10,545-10,500

Perforations

Perforated and open-hole intervals.

FromToType
8,2268,237Perforated
8,6668,674Perforated
10,48210,498Perforated
10,50210,510Perforated
10,51810,526Perforated
10,54410,554Perforated
10,63010,637Perforated
10,72010,726Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,02717.51,570 S
9.6259,15012.251,225 S
5.511,1916.75541 S
511,1916.75541 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 27, 2001Jan 5, 2001—
00Apr 22, 1999Mar 4, 1999Yes
00Apr 7, 1999——
00Aug 27, 1997Aug 12, 1997Yes
00Jun 10, 1996Apr 4, 1996—
00Feb 8, 1994Jan 3, 1994Yes
00Jan 10, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27332192, documented in the API reference.