TEXAS · WELLS · KLEBERG COUNTY · KING RANCH LAGUNA LARGA LEASE · API 42-273-32263 · DISTRICT 04

King Ranch Laguna Larga #1066

Plugged

Kleberg County · T-C-B (Vxbg Consolidated) field  · Vertical

King Ranch Laguna Larga #1066 (API 42-273-32263) is a plugged well in Kleberg County, plugged September 11, 2025, last operated by Eog Resources Inc..

The RRC has issued one drilling permit, issued February 4, 1998, permitted to 12,525 ft.

It was permitted by Exxon Corp. and has since transferred to Eog Resources Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including 10,250 Sand, 10250 Sand, 10,600 Sand, 10600 Sand.

Operator of record

EOG Resources Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,354
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsExxon Mobil Corporationthrough Aug 2010
Latest permitExxon Corp.Feb 4, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,525
total depth, ft
1
permits on file
Feb 4, 1998
last permit issued
Jun 29, 2010
completed
0
cumulative oil, bbl
1.73M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH Nov 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 29, 2010
Shut in
—
Plugged
Sep 11, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Laguna Larga G-4-168930T-C-B (Vxbg Consolidated)EOG Resources, Inc.101.73MJun 1998 – Nov 2025

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jun 1998 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Aug 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
472797-99DrillExxon Corp.Jan 30, 1998Feb 4, 1998Apr 13, 199812,525

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 29, 2010King Ranch Laguna Larga G-4-168930T-C-B (Vxbg Consolidated)EOG Resources Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 24 ft elevation.Download CSV →

FormationMD ftSubsea
10,250 Sand10,688-10,664
10250 Sand10,688-10,664
10,600 Sand10,954-10,930
10600 Sand10,954-10,930
JacksonJACKSON SHALE12,449-12,425

Perforations

Perforated and open-hole intervals.

FromToType
10,39710,412Perforated
10,69310,698Perforated
10,69310,724Perforated
10,70910,714Perforated
10,95710,960Perforated
11,00411,007Perforated
11,01711,020Perforated
11,46611,488Perforated
11,59011,612Perforated
12,09012,112Perforated
12,14012,160Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,52312.25835 S
10.751,52312.75835 S
10.751,52314.75835 S
7.6258,4999.875540 S
512,4636.75600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 8, 2010Jul 7, 2010—
00Aug 1, 2008Apr 25, 2008—
00Aug 19, 2005Apr 11, 2005—
00Nov 30, 2001Nov 16, 2001—
00May 15, 2000Mar 13, 2000—
00Jul 31, 1998Jul 14, 1998Yes
00Jul 24, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27332263, documented in the API reference.