WELL · 42-273-32371 · DISTRICT 4

King Ranch Borregos #M102E

Plugged

Kleberg County · Borregos (Zone K-11) field  · Vertical

King Ranch Borregos #M102E (API 42-273-32371) is a plugged well in Kleberg County, plugged February 7, 2025, last operated by Eog Resources Inc..

The RRC has issued 2 drilling permits between 2002 and 2015, permitted to 14,500 ft.

Completion filings report 8 formation tops, including 20-I, K O8, Pamp7, K11.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,348
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Aug 2021
Latest permitEOG Resources, Inc.Jun 8, 2015
14,500
total depth, ft
2
permits on file
Jun 8, 2015
last permit issued
Jun 20, 2015
completed
0
cumulative oil, bbl
335K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2003 THROUGH Jan 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 20, 2015
Shut in
—
Plugged
Feb 7, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Borregos G-4-278021Borregos (Zone K-11)EOG Resources, Inc.10152KJun 2015 – Jan 2025
King Ranch Borregos G-4-195066Kingsville, SW (Taos)EOG Resources, Inc.10182KFeb 2003 – Aug 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Mobil CorporationFeb 2003 → Mar 2005
  2. 2EOG Resources, Inc.Jun 2015 → Aug 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
807229-99RecompletionEOG Resources, Inc.Jun 5, 2015Jun 8, 2015—14,500
524651-99DrillExxon Mobil CorporationOct 16, 2002Oct 16, 2002Dec 25, 200214,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-195066————
—— G-4-278021————

Formation tops

As filed on W-2/G-1. Subsea from 70 ft elevation.Download CSV →

FormationMD ftSubsea
20-I7,523-7,453
K O810,197-10,127
PAMP710,447-10,377
K1110,730-10,660
Pamp 610,746-10,676
Pamp 511,077-11,007
Pamp 411,364-11,294
Taos11,600-11,530

Perforations

Perforated and open-hole intervals.

FromToType
10,84611,038Perforated
11,58011,590Perforated
11,68211,686Perforated
11,71811,724Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,99414.751,017 S
7.6258,6219.875932 S
3.512,0846.51,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 5, 2015Aug 31, 2015—
00Jul 7, 2003May 30, 2003Yes
00Jun 27, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27332371, documented in the API reference.