TEXAS · WELLS · KLEBERG COUNTY · KING RANCH-N. VISNAGA LEASE · API 42-273-32469 · DISTRICT 04
King Ranch-N. Visnaga #1
Kleberg County · North Visnaga (I-63) field · Directional
King Ranch-N. Visnaga #1 (API 42-273-32469) is a plugged well in Kleberg County, plugged August 23, 2011, last operated by Exxon Mobil Corporation.
The RRC has issued 2 drilling permits between 2006 and 2007, permitted to 10,600 ft.
Completion filings report 4 formation tops, including I-63, I-84, I-96, Morgan.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 15, 2026
- Permits on file
- 1,223
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | Exxon Mobil Corporationthrough Apr 2009 |
| Latest permit | Exxon Mobil CorporationJul 13, 2007 |
- 10,600
- total depth, ft
- 2
- permits on file
- Jul 13, 2007
- last permit issued
- Jan 8, 2007
- completed
- 0
- cumulative oil, bbl
- 2.11M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Apr 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 8, 2007
- Shut in
- —
- Plugged
- Aug 23, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch-N. Visnaga G-4-224078 | North Visnaga (I-63) | Exxon Mobil Corporation | 1 | 0 | 2.11M | Jan 2007 – Aug 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Mobil CorporationMar 2007 → Apr 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 641767-99 | Field transfer | Exxon Mobil Corporation | Jul 2, 2007 | Jul 13, 2007 | Dec 27, 2006 | 10,600 |
| 628269-99 | Drill | Exxon Mobil Corporation | Oct 30, 2006 | Nov 8, 2006 | — | 10,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 8, 2007 | King Ranch-N. Visnaga G-4-224078 | North Visnaga (I-63) | Exxon Mobil Corporation | Plugged | — |
| Jan 8, 2007 | King Ranch-N. Visnaga G-4-224078 | North Visnaga (I-63) | Exxon Mobil Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 49 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| I-63 | 9,674 | -9,625 |
| I-84 | 9,816 | -9,767 |
| I-96 | 9,860 | -9,811 |
| Morgan | 10,080 | -10,031 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,674 | 9,696 | Perforated |
| 9,702 | 9,709 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 105 | — | — |
| 9.625 | 1,495 | 12.25 | 748 S |
| 2.875 | 10,691 | 8.5 | 763 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 25, 2007 | Jul 18, 2007 | — |
| 00 | Apr 26, 2007 | Jan 18, 2007 | Yes |
| 00 | Jan 29, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-273-32469 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-273-32469 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/27332469, documented in the API reference.