WELL · 42-273-32514 · DISTRICT 4

King Ranch Madero #29

Plugged

Kleberg County · Alazan North (Frio Cons.) field  · Directional

King Ranch Madero #29 (API 42-273-32514) is a plugged well in Kleberg County, plugged July 15, 2024, last operated by Exxon Mobil Corporation.

The RRC has issued one drilling permit, issued June 23, 2009, permitted to 13,200 ft.

Completion filings report 8 formation tops, including H-56 Sand, H-57 Sand, H-82 Sand, I-54 Sand.

Its 2 leases have reported 1.37K barrels of oil and 1.72M mcf of gas since September 2009, last reporting in July 2024. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Mobil Corporation

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Mobil Corporationthrough Jan 2012
Latest permitExxon Mobil CorporationJun 23, 2009
13,200
total depth, ft
1
permits on file
Jun 23, 2009
last permit issued
Sep 4, 2009
completed
1.37K
cumulative oil, bbl
1.72M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2009 THROUGH Jul 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 4, 2009
Shut in
—
Plugged
Jul 15, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch Madero G-4-252949Alazan, North (Frio Cons.)EOG Resources, Inc.101.7MSep 2009 – Jul 2024
King Ranch Madero O-4-13564Alazan, North (Frio Cons.)Exxon Mobil Corporation11.37K13.4KSep 2009 – May 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Mobil CorporationSep 2009 → Jan 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
681999-99DrillExxon Mobil CorporationJun 10, 2009Jun 23, 2009Aug 12, 200913,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-252949————
—— O-4-13564————

Formation tops

As filed on W-2/G-1. Subsea from 33 ft elevation.Download CSV →

FormationMD ftSubsea
H-56 Sand8,932-8,899
H-57 Sand8,932-8,899
H-82 Sand9,270-9,237
I-54 Sand9,621-9,588
I-65 Sand9,760-9,727
Morgan Sand10,466-10,433
J-92 Sand11,315-11,282
J92 Sand11,315-11,282
H-57 Sand——
H-82 Sand——
I-54 Sand——

Perforations

Perforated and open-hole intervals.

FromToType
8,9258,945Perforated
8,9268,946Perforated
8,9528,960Perforated
8,9548,962Perforated
8,9768,990Perforated
9,0029,007Perforated
9,2749,300Perforated
9,6239,632Perforated
9,6469,657Perforated
9,7649,770Perforated
10,46810,475Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,18012.251,315 S
3.511,6688.52,205 S
9.62531,88012.251,315 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 2013Dec 31, 2012—
00Nov 14, 2011Jun 7, 2011—
00Nov 19, 2010Oct 27, 2010—
00Feb 3, 2010Oct 20, 2009—
00Dec 9, 2009——
00Dec 8, 2009Sep 9, 2009Yes
00Sep 21, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27332514, documented in the API reference.